Interactive Map

Road closure, condition and construction information is available through our hands free 511 automated service or on Twitter! Simply dial 511 or follow us @511Ontario!

Loading... please wait
Loading... please wait

Select information to display on map:

Hide/show control panel

Legend


Reports by Region: Northwestern  Northeastern  Eastern  Central  Southwestern

Last updated: 2017-12-15 - afternoon report

Southwestern Ontario Road Conditions
Highways Area Road Condition Last Updated

Southwestern (file generated at 12:33 PM)
10 Shelburne to Orangeville partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:11
10 Flesherton to Shelburne partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:11
10 Chatsworth to Flesherton partly snow covered with bare and wet road sections. 2017-12-15 11:11
19 Tillsonburg to Ingersoll partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:08
21 Highway 402 to Zurich - Hensall Road bare and wet road with bare and dry road sections. 2017-12-15 11:05
21 Zurich - Hensall Road to Goderich partly snow covered with bare and wet road sections. 2017-12-15 11:10
21 Goderich to Underwood partly snow covered with bare and wet road sections. 2017-12-15 11:12
21 Underwood to Springmount snow covered with partly snow covered sections. 2017-12-15 11:12
23 Elginfield to Harriston partly snow covered with bare and wet road sections. 2017-12-15 11:09
24 Simcoe to Brantford partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:06
24 Brantford to Cambridge partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:06
26 Collingwood to Owen Sound partly snow covered with bare and wet road sections. 2017-12-15 11:11
3 Niagara County Line to Simcoe partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:08
3 Simcoe to St.Thomas partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:08
3 Leamington to East of Highway 401 bare and wet road with bare and dry road sections. 2017-12-15 11:03
3 East of Highway 401 to Windsor bare and wet road with bare and dry road sections. 2017-12-15 11:03
4 St.Thomas to London bare and wet road with bare and dry road sections. 2017-12-15 11:05
4 London to Highway 8 partly snow covered with bare and wet road sections. 2017-12-15 11:10
40 Chatham to Wallaceburg bare and wet road with bare and dry road sections. 2017-12-15 11:04
40 Wallaceburg to Sarnia bare and wet road with bare and dry road sections. 2017-12-15 11:05
401 Drumbo to Highway 6 bare and wet road with bare and dry road sections. 2017-12-15 11:07
401 Ingersoll to Drumbo partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:06
401 London to Ingersoll bare and wet road with bare and dry road sections. 2017-12-15 11:05
401 Chatham/Kent to London bare and dry road 2017-12-15 11:04
401 Tilbury to Chatham/Kent bare and wet road with bare and dry road sections. 2017-12-15 11:04
401 North Talbot Road to Tilbury bare and wet road with bare and dry road sections. 2017-12-15 11:03
401 Windsor to North Talbot Road bare and wet road with bare and dry road sections. 2017-12-15 11:03
402 Nauvoo Road to London bare and wet road with bare and dry road sections. 2017-12-15 11:05
402 Sarnia to Nauvoo Road bare and wet road with bare and dry road sections. 2017-12-15 11:05
403 Brant/Hamilton County to Highway 401 partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:06
6 Port Dover to Caledonia partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:08
6 Highway 401 to Highway 7 - Woodlawn Road bare and wet road with bare and dry road sections. 2017-12-15 11:07
6 Guelph to Fergus bare and wet road with bare and dry road sections. 2017-12-15 11:07
6 Fergus to Mount Forest partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:11
6 Mount Forest to Owen Sound partly snow covered with bare and wet road sections. 2017-12-15 11:11
6 Owen Sound to Tobermory snow covered with partly snow covered sections. 2017-12-15 11:12
7 Guelph to Acton bare and wet road with bare and dry road sections. 2017-12-15 11:07
7 Waterloo to Guelph bare and wet road with bare and dry road sections. 2017-12-15 11:07
7 Stratford to Kitchener bare and wet road with bare and dry road sections. 2017-12-15 11:07
7 Elginfield to Stratford partly snow covered with bare and wet road sections. 2017-12-15 11:09
7087 Highway 3 to Ojibway Parkway bare and wet road with bare and dry road sections. 2017-12-15 11:03
77 Leamington to Highway 401 bare and wet road with bare and dry road sections. 2017-12-15 11:03
8 Kitchener to Highway 401 bare and wet road with bare and dry road sections. 2017-12-15 11:07
8 Stratford to Kitchener bare and wet road with bare and dry road sections. 2017-12-15 11:07
8 Mitchell to Stratford partly snow covered with bare and wet road sections. 2017-12-15 11:09
8 Goderich to Mitchell partly snow covered with bare and wet road sections. 2017-12-15 11:10
85 Victoria Street overpass to End of core/collectors bare and wet road with bare and dry road sections. 2017-12-15 11:07
85 End of core/collectors to St.Jacobs bare and wet road with bare and dry road sections. 2017-12-15 11:07
89 Rosemont to Harriston partly snow covered with bare and dry road, bare and wet road sections. 2017-12-15 11:11
9 Kincardine to Harriston partly snow covered with bare and wet road sections. 2017-12-15 11:12

Unscheduled road closures and events for provincial highways:

Unscheduled Events

EASTPORT DRIVE Northbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Maintenance
Highway:EASTPORT DRIVE
Direction:Northbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 13, 2017 21:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-11 11:03

Top of page Top of page


EASTPORT DRIVE Southbound [ LIFT BRIDGE - LIFT BRIDGE ] - Recurring-Maintenance
Highway:EASTPORT DRIVE
Direction:Southbound
From/At:LIFT BRIDGE
To:LIFT BRIDGE
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 13, 2017 21:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-11 11:02

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday: 1 lane closure from 00:00 to 14:00.
Event Start:December 18, 2017 00:00
Event End:December 18, 2017 14:00
Last Change: Entered 2017-12-14 10:03

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 10:00

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 00:00 to 23:59. Monday: 1 lane closure from 17:00 to 15:00 the next day. Tuesday to Wednesday: 1 lane closure from 19:00 to 15:00 the next day. Thursday: 1 lane closure from 19:00 to 12:00 the next day. Friday: 1 lane closure from 21:00 to 10:00 the next day. Saturday: 1 lane closure from 17:00 to 23:59
Event Start:December 10, 2017 00:00
Event End:December 16, 2017 23:59
Last Change: Entered 2017-12-07 14:32

Top of page Top of page


HWY 11 Northbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - TOWNLINE ROAD 12-13 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:TOWNLINE ROAD 12-13
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: Shoulder closed 9:00-15:00. Friday: Shoulder closed 9:00-11:00.
Event Start:December 18, 2017 09:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-12-13 15:23

Top of page Top of page


HWY 11 Northbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - TOWNLINE ROAD 12-13 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:TOWNLINE ROAD 12-13
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 21:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:42

Top of page Top of page


HWY 11 Northbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - TOWNLINE ROAD 12-13 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Northbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:TOWNLINE ROAD 12-13
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 11, 2017 09:00
Event End:December 15, 2017 15:00
Last Change: Entered 2017-12-07 08:36

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Friday: 1 lane closure from 00:00 to 12:00.
Event Start:December 22, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 10:06

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 22:00 to 23:59. Monday to Thursday: 1 lane closure from 00:00 to 23:59. Friday: 1 lane closure from 18:00 to 10:00 the next day. Saturday: 1 lane closure from 15:00 to 10:00 the next day.
Event Start:December 10, 2017 00:00
Event End:December 16, 2017 23:59
Last Change: Entered 2017-12-07 14:37

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 10:09

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Friday: 1 lane closure from 00:00 to 13:00.
Event Start:December 15, 2017 00:00
Event End:December 15, 2017 13:00
Last Change: Entered 2017-12-07 14:35

Top of page Top of page


HWY 11 Southbound [ TOWNLINE ROAD 12-13 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:TOWNLINE ROAD 12-13
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: Shoulder closed 9:00-15:00. Friday: Shoulder closed 9:00-11:00.
Event Start:December 18, 2017 09:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-12-13 15:24

Top of page Top of page


HWY 11 Southbound [ TOWNLINE ROAD 12-13 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:TOWNLINE ROAD 12-13
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 21:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:44

Top of page Top of page


HWY 11 Southbound [ TOWNLINE ROAD 12-13 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Maintenance
Highway:HWY 11
Direction:Southbound
From/At:TOWNLINE ROAD 12-13
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 11, 2017 09:00
Event End:December 15, 2017 15:00
Last Change: Entered 2017-12-07 08:47

Top of page Top of page


HWY 12 Northbound [ ATHERLEY ROAD - ATHERLEY ROAD ] - Recurring-Construction
Highway:HWY 12
Direction:Northbound
From/At:ATHERLEY ROAD
To:ATHERLEY ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 11, 2017 09:00
Event End:December 15, 2017 15:00
Last Change: Entered 2017-12-04 16:07

Top of page Top of page


HWY 15 Northbound [ HWY 401 - HWY 401 ] - Recurring-Construction
Highway:HWY 15
Direction:Northbound
From/At:HWY 401
To:HWY 401
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Alternating lane closure. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 07:00
Last Change: Entered 2017-12-09 06:44

Top of page Top of page


HWY 15 Southbound [ HWY 401 - HWY 401 ] - Recurring-Construction
Highway:HWY 15
Direction:Southbound
From/At:HWY 401
To:HWY 401
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Alternating lane closure. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 07:00
Last Change: Entered 2017-12-09 06:45

Top of page Top of page


HWY 17 Eastbound [ BRUCE ST - HWY 60 (O'BRIEN ST) ] - Construction
Highway:HWY 17
Direction:Eastbound
From/At:BRUCE ST
To:HWY 60 (O'BRIEN ST)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Single lane closure with flagging operations on Hwy 17 @ Constable Philip Shrive Memorial Bridge (Renfrew)
Event Start:December 15, 2017 08:00
Event End:December 15, 2017 15:00
Last Change: Entered 2017-12-11 15:39

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 10, 2017 07:00
Event End:December 16, 2017 12:00
Last Change: Entered 2017-12-06 09:54

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 07:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-12-12 16:03

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 10, 2017 07:00
Event End:December 16, 2017 12:00
Last Change: Entered 2017-12-06 10:16

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 18, 2017 07:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-12-12 15:56

Top of page Top of page


HWY 35/115 Northbound [ 3RD ROAD - 5TH ROAD ] - Recurring-Construction
Highway:HWY 35/115
Direction:Northbound
From/At:3RD ROAD
To:5TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 18:00. Full reopen at 14:00 the next day. Friday: 1 lane closure at 18:00. Full reopen at 12:00 the next day.
Event Start:December 10, 2017 18:00
Event End:December 16, 2017 12:00
Last Change: Entered 2017-12-06 10:14

Top of page Top of page


HWY 35/115 Northbound [ 3RD ROAD - 5TH ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:3RD ROAD
To:5TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from 3RD ROAD WB, Off-ramp to 5TH ROAD EB, Off-ramp to 4TH ROAD EB
ReasonRecurring-Engineering Investigation
Comment :Mon-Thu: alternating 1 lane closure 0800-1400. Fri: alternating 1 lane closure 0800-1200.
Event Start:December 18, 2017 08:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 13:56

Top of page Top of page


HWY 35/115 Northbound [ 5TH ROAD - 7TH ROAD/DURHAM ROAD 9 ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:5TH ROAD
To:7TH ROAD/DURHAM ROAD 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from TAMBLYN ROAD WB, Off-ramp to TAMBLYN ROAD EB, Off-ramp to 7TH ROAD/DURHAM ROAD 9 EB
ReasonRecurring-Engineering Investigation
Comment :Mon-Thu: alternating 1 lane closure 0800-1400. Fri: alternating 1 lane closure 0800-1200.
Event Start:December 18, 2017 08:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 14:14

Top of page Top of page


HWY 35/115 Northbound [ 5TH ROAD - 7TH ROAD/DURHAM ROAD 9 ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:5TH ROAD
To:7TH ROAD/DURHAM ROAD 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Sunday-Wednesday: 1 lane closed at 18:00. All lanes reopened at 14:00. Thursday: 1 lane closed at 18:00. All lanes reopened at 12:00. Friday: 1 lane closed at 23:00. All lanes reopened at 08:00.
Event Start:December 10, 2017 18:00
Event End:December 16, 2017 08:00
Last Change: Entered 2017-12-07 12:53

Top of page Top of page


HWY 35/115 Northbound [ 7TH ROAD/DURHAM ROAD 9 - 8TH ROAD ] - Recurring-Construction
Highway:HWY 35/115
Direction:Northbound
From/At:7TH ROAD/DURHAM ROAD 9
To:8TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 11, 2017 06:00
Event End:December 15, 2017 15:00
Last Change: Entered 2017-12-07 16:12

Top of page Top of page


HWY 35/115 Northbound Off-ramp [ - HWY 35 Northbound ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:
To:HWY 35 Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 11:18

Top of page Top of page


HWY 35/115 Northbound On-ramp [ HWY 35 Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:HWY 35 Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 11:20

Top of page Top of page


HWY 35/115 Southbound [ 5TH ROAD - 3RD ROAD ] - Recurring-Construction
Highway:HWY 35/115
Direction:Southbound
From/At:5TH ROAD
To:3RD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 08, 2017 00:00
Event End:December 15, 2017 23:59
Last Change: Entered 2017-12-06 10:09

Top of page Top of page


HWY 35/115 Southbound [ 5TH ROAD - 3RD ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:5TH ROAD
To:3RD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from STATION ST. EB, On-ramp from 4TH ROAD EB, On-ramp from 3RD ROAD EB, Off-ramp to STATION ST. WB, Off-ramp to 4TH ROAD WB, Off-ramp to 3RD ROAD WB
ReasonRecurring-Engineering Investigation
Comment :Mon-Thu: alternating 1 lane closure all day. Fri: alternating 1 lane closure 2359-1200.
Event Start:December 18, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 14:04

Top of page Top of page


HWY 35/115 Southbound [ 7TH ROAD/DURHAM ROAD 9 - 5TH ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:7TH ROAD/DURHAM ROAD 9
To:5TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 11, 2017 00:00
Event End:December 15, 2017 23:59
Last Change: Entered 2017-12-07 12:49

Top of page Top of page


HWY 35/115 Southbound [ 7TH ROAD/DURHAM ROAD 9 - 5TH ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:7TH ROAD/DURHAM ROAD 9
To:5TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MILL ST EB, Off-ramp to MILL ST WB
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 14:21

Top of page Top of page


HWY 35/115 Southbound [ 8TH ROAD - 7TH ROAD/DURHAM ROAD 9 ] - Recurring-Construction
Highway:HWY 35/115
Direction:Southbound
From/At:8TH ROAD
To:7TH ROAD/DURHAM ROAD 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 11, 2017 09:00
Event End:December 15, 2017 17:00
Last Change: Entered 2017-12-07 16:16

Top of page Top of page


HWY 35/115 Southbound [ HWY 35 - 8TH ROAD ] - Recurring-Construction
Highway:HWY 35/115
Direction:Southbound
From/At:HWY 35
To:8TH ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 11, 2017 00:00
Event End:December 15, 2017 23:59
Last Change: Entered 2017-12-04 15:25

Top of page Top of page


HWY 35/115 Southbound Off-ramp [ - HWY 35 Northbound ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:
To:HWY 35 Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 11:22

Top of page Top of page


HWY 35/115 Southbound On-ramp [ HWY 35 Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:HWY 35 Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 18, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 11:24

Top of page Top of page


HWY 37 Northbound [ Wiser Rd - Harmony Rd ] - Construction
Highway:HWY 37
Direction:Northbound
From/At:Wiser Rd
To:Harmony Rd
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Flagging operations. Vehicles will be able to get by.
Event Start:December 17, 2017 07:30
Event End:December 17, 2017 11:30
Last Change: Entered 2017-12-11 12:28

Top of page Top of page


HWY 4 Northbound [ North Limits of London - County Road 13 / Mary Street ] - Recurring-Maintenance
Highway:HWY 4
Direction:Northbound
From/At:North Limits of London
To:County Road 13 / Mary Street
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Lane closure affects both directions of Highway 4.
Event Start:December 11, 2017 06:30
Event End:December 15, 2017 19:00
Last Change: Entered 2017-12-09 09:55

Top of page Top of page


HWY 4 Northbound [ North Limits of London - County Road 13 / Mary Street ] - Recurring-Maintenance
Highway:HWY 4
Direction:Northbound
From/At:North Limits of London
To:County Road 13 / Mary Street
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Lane closure affects both directions of Highway 4.
Event Start:December 11, 2017 06:30
Event End:December 15, 2017 19:00
Last Change: Entered 2017-12-09 09:19

Top of page Top of page


HWY 400 Northbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 10:00. Thursday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 9:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 10:00.
Event Start:December 11, 2017 20:00
Event End:December 18, 2017 10:00
Last Change: Entered 2017-12-06 18:40

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - HWY 9 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:AURORA ROAD.
To:HWY 9
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 19:00, 2 lane closure at 20:00. 1 lane reopen at 6:00, full reopen at 11:00. Friday: 1 lane closure at 19:00, 2 lane closure at 21:00. 1 lane reopen at 8:00, full reopen at 11:00. Saturday: 1 lane closure at 17:00, 2 lane closure at 19:00. 1 lane reopen at 10:00, full reopen at 11:00. Sunday: 2 lane closure at 21:00. 1 lane reopen at 6:00, full reopen at 11:00.
Event Start:December 11, 2017 17:00
Event End:December 18, 2017 11:00
Last Change: Entered 2017-12-06 19:01

Top of page Top of page


HWY 400 Northbound [ CANAL ROAD. - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:CANAL ROAD.
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 2 lanes closed at 21:00, one lane reopens at 06:00, all lanes open at 11:00. Monday-Thursday: 1 lane closed at 19:00 expanding to a 2 lane closure at 21:00, one lane reopens at 06:00, all lanes open at 11:00. Friday: 1 lane closed at 21:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 08:00 and full reopen at 11:00
Event Start:December 10, 2017 21:00
Event End:December 16, 2017 11:00
Last Change: Entered 2017-12-06 20:04

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 06:00. Monday-Thursday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 06:00. Friday: 1 lane closure from 00:00 to 12:00 and 1 lane (of Lane 2) closure from 22:00 to 10:00. Saturday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 22:00 to 10:00.
Event Start:December 10, 2017 00:00
Event End:December 16, 2017 23:59
Last Change: Entered 2017-12-07 14:19

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 06:00. Monday-Thursday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 06:00. Friday: 2 lane closure at 00:00. 1 lane reopens at 06:00 and full reopen at 12:00.
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 09:46

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Friday: 1 lane closure from 20:00 to 23:59.
Event Start:December 15, 2017 20:00
Event End:December 15, 2017 23:59
Last Change: Entered 2017-12-07 14:20

Top of page Top of page


HWY 400 Northbound [ ESSA ROAD / SIMCOE ROAD 27 - DUNLOP STREET / SIMCOE ROAD 90 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:ESSA ROAD / SIMCOE ROAD 27
To:DUNLOP STREET / SIMCOE ROAD 90
Lanes Affected:2 Right Lane(s)
Traffic Impact :On-ramp from ESSA ROAD / SIMCOE ROAD 27 EB, Off-ramp to DUNLOP STREET / SIMCOE ROAD 90 EB
ReasonRecurring-Construction
Comment :
Event Start:December 12, 2017 23:00
Event End:December 16, 2017 07:00
Last Change: Entered 2017-12-07 10:04

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - MAPLEVIEW DRIVE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:MAPLEVIEW DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 EB, On-ramp from INNISFIL BEACH ROAD - SIMCOE ROAD 21 WB, Off-ramp to MAPLEVIEW DRIVE EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:00, 2 lane closure at 21:00. Full reopen at 7:00. Friday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 9:00. Saturday: 1 lane closure at 19:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 19:00, 2 lane closure at 22:00. Full reopen at 7:00.
Event Start:December 11, 2017 19:00
Event End:December 18, 2017 10:00
Last Change: Entered 2017-12-06 18:54

Top of page Top of page


HWY 400 Northbound [ LANGSTAFF ROAD - BASS PRO MILLS DRIVE ] - Recurring-Maintenance
Highway:HWY 400
Direction:Northbound
From/At:LANGSTAFF ROAD
To:BASS PRO MILLS DRIVE
Lanes Affected:4 Alternating Lane(s)
Traffic Impact :Off-ramp to BASS PRO MILLS DRIVE EB/WB
ReasonRecurring-Maintenance
Comment :Tuesday-Thursday: 2 lane closure at 22:00, 3 lane closure at 23:00, and 4 lane closure at midnight. 2 lanes reopen at 04:00 and full reopen at 05:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00, 4 lane closure at midnight. 2 lanes reopen at 04:00 and full reopen at 05:00.
Event Start:December 12, 2017 22:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-08 12:46

Top of page Top of page


HWY 400 Southbound [ 401 - 401 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:401
To:401
Lanes Affected:ALL LANES CLOSED
Traffic Impact :Off-ramp to 401 WB
ReasonRecurring-Construction
Comment :Sunday-Wednesday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:December 17, 2017 21:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 06:53

Top of page Top of page


HWY 400 Southbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 18:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 8:00, full reopen at 10:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:December 11, 2017 18:00
Event End:December 18, 2017 10:00
Last Change: Entered 2017-12-06 18:46

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:CANAL ROAD.
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 8:00, full reopen at 11:00.
Event Start:December 18, 2017 11:00
Event End:December 23, 2017 11:00
Last Change: Entered 2017-12-15 06:46

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:CANAL ROAD.
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 8:00, full reopen at 11:00. Saturday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 9:00, full reopen at 11:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:December 11, 2017 11:00
Event End:December 18, 2017 11:00
Last Change: Entered 2017-12-06 19:02

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 21:00
Event End:December 17, 2017 23:59
Last Change: Entered 2017-12-14 09:57

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 Lane closure from 00:00 to 11:00 and 1 lane closure (of Lane 2) from 22:00 to 06:00. Monday-Friday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 6:00. Saturday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 09:00.
Event Start:December 10, 2017 00:00
Event End:December 16, 2017 23:59
Last Change: Entered 2017-12-07 14:27

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 Lane closure from 00:00 to 11:00 and 2 lane closure from 22:00 to 06:00. Monday-Thursday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 6:00. Friday: 2 lane closure at 00:00. 1 lane reopens at 06:00 and full reopen at 12:00.
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 09:57

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:MAPLEVIEW DRIVE
To:INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from MAPLEVIEW DRIVE EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 19:00, 2 lane closure at 21:00. 1 lane reopen at 5:00, full reopen at 6:00. Friday: 1 lane closure at 19:00, 2 lane closure at 21:00. 1 lane reopen at 8:00, full reopen at 9:00. Saturday: 1 lane closure at 19:00, 2 lane closure at 21:00. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 5:00, full reopen at 6:00.
Event Start:December 11, 2017 19:00
Event End:December 18, 2017 10:00
Last Change: Entered 2017-12-06 18:58

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:PARTRIDGE SKI TRAIL ROAD
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Saturday: 1 lane closure from 00:00-23:59.
Event Start:December 10, 2017 00:00
Event End:December 16, 2017 23:59
Last Change: Entered 2017-12-07 14:23

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:PARTRIDGE SKI TRAIL ROAD
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-14 09:54

Top of page Top of page


HWY 400 Southbound [ RUTHERFORD - BASS PRO MILLS DRIVE ] - Recurring-Maintenance
Highway:HWY 400
Direction:Southbound
From/At:RUTHERFORD
To:BASS PRO MILLS DRIVE
Lanes Affected:4 Alternating Lane(s)
Traffic Impact :On-ramp from BASS PRO MILLS DRIVE WB
ReasonRecurring-Maintenance
Comment :
Event Start:December 11, 2017 23:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-08 12:50

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:SIMCOE ROAD 88
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closed at 20:00 expanding to a 2 lane closure at 22:00. Full reopen at 05:00. Monday-Thursday: 1 lane closed at 11:00 expanding to a 2 lane closure at 19:00. Full reopen at 05:00. Friday: 1 lane closed at 18:00 expanding to a 2 lane closure at 20:00. 1 lane reopens at 08:00 and full reopen at 10:00
Event Start:December 10, 2017 20:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-06 20:08

Top of page Top of page


HWY 401 Eastbound [ AVONMORE RD - AVONMORE RD ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:AVONMORE RD
To:AVONMORE RD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Right lane closed Hwy 401 E/B & W/B @ Avonmore Rd (Long Sault)
Event Start:December 15, 2017 08:00
Event End:December 15, 2017 17:00
Last Change: Entered 2017-12-14 14:12

Top of page Top of page


HWY 401 Eastbound [ CATARAQUI RIVER BRIDGE - JOHN F. SCOTT RD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:CATARAQUI RIVER BRIDGE
To:JOHN F. SCOTT RD
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Two left lanes closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:29

Top of page Top of page


HWY 401 Eastbound [ GARDINERS RD/ CTY RD 38 (IC 611) - GARDINERS RD/ CTY RD 38 (IC 611) ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:GARDINERS RD/ CTY RD 38 (IC 611)
To:GARDINERS RD/ CTY RD 38 (IC 611)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Lane reductions Hwy 401 E/B & W/B west of Gardiners Rd (Kingston)
Event Start:December 13, 2017 06:00
Event End:December 21, 2017 14:00
Last Change: Entered 2017-12-06 11:45

Top of page Top of page


HWY 401 Eastbound [ GARDINERS RD/ CTY RD 38 (IC 611) - SYDENHAM RD (IC 613) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GARDINERS RD/ CTY RD 38 (IC 611)
To:SYDENHAM RD (IC 613)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Left lane closed. Kingston
Event Start:October 13, 2017 06:00
Event End:December 22, 2017 19:00
Last Change: Entered 2017-12-09 07:21

Top of page Top of page


HWY 401 Eastbound [ GARDINERS RD/ CTY RD 38 (IC 611) - SYDENHAM RD (IC 613) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GARDINERS RD/ CTY RD 38 (IC 611)
To:SYDENHAM RD (IC 613)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Right lane closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:42

Top of page Top of page


HWY 401 Eastbound [ GARDINERS RD/ CTY RD 38 (IC 611) - SYDENHAM RD (IC 613) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GARDINERS RD/ CTY RD 38 (IC 611)
To:SYDENHAM RD (IC 613)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Left lane closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:51

Top of page Top of page


HWY 401 Eastbound [ GUELPH LINE - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GUELPH LINE
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 05:00
Last Change: Entered 2017-12-14 07:01

Top of page Top of page


HWY 401 Eastbound [ GUELPH LINE - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GUELPH LINE
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-07 06:23

Top of page Top of page


HWY 401 Eastbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 05:00
Last Change: Entered 2017-12-14 08:30

Top of page Top of page


HWY 401 Eastbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, full reopen at 8:00.
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-07 06:29

Top of page Top of page


HWY 401 Eastbound [ HWY 412 - BROCK ST ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 412
To:BROCK ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:30, 2 lane closure at 22:30. 1 lane reopen at 6:00, full reopen at 7:00. Friday: 1 lane closure at 20:30, 2 lane closure at 22:30. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 20:30, 2 lane closure at 22:30. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 20:30, 2 lane closure at 22:00. 1 lane reopen at 6:00, full reopen at 7:00.
Event Start:December 11, 2017 21:00
Event End:December 18, 2017 07:00
Last Change: Entered 2017-12-07 08:11

Top of page Top of page


HWY 401 Eastbound [ Homer Watson Blvd / Fountain St/Red Rd 28 (275KM) - Highway 24 / Hespeler Rd (282KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Homer Watson Blvd / Fountain St/Red Rd 28 (275KM)
To:Highway 24 / Hespeler Rd (282KM)
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from Highway 8 / King Street E/Shantz Hill Rd (278KM) EB, Off-ramp to Highway 8 / King Street E/Shantz Hill Rd (278KM) EB
ReasonRecurring-Construction
Comment :Highway 401 eastbound from Homer Watson to Hespeler Road will have nightly alternating lane closures from Tuesday,December 12th, 2017, to Saturday, December 16th, 2017, from 2000 hours to 0600 hours for construction purposes. The eastbound on and off ramps from King Street to Highway 401, will also have nightly closures on December 12th & 13th
Event Start:December 12, 2017 17:00
Event End:December 16, 2017 09:00
Last Change: Entered 2017-12-12 09:21

Top of page Top of page


HWY 401 Eastbound [ JAMES SNOW PKWY - TRAFALGAR ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JAMES SNOW PKWY
To:TRAFALGAR ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. All lanes reopen at 05:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 06:00, full reopen at 08:00.
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-07 06:26

Top of page Top of page


HWY 401 Eastbound [ Merlin Road / Kent Road 7 (69KM) - Victoria Road / Kent Road 17 (109KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Merlin Road / Kent Road 7 (69KM)
To:Victoria Road / Kent Road 17 (109KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 will have alternating eastbound and westbound left lane closures from Merlin Road to Victoria Road on December 11, 12, 13, 14 and 15 from 0730 hours to 1830 hours.
Event Start:December 11, 2017 07:30
Event End:December 15, 2017 18:30
Last Change: Entered 2017-12-08 11:44

Top of page Top of page


HWY 401 Eastbound [ NASSAGWAEGA ROAD - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:NASSAGWAEGA ROAD
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 05:00
Last Change: Entered 2017-12-14 07:02

Top of page Top of page


HWY 401 Eastbound [ NASSAGWAEGA ROAD - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:NASSAGWAEGA ROAD
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-07 06:24

Top of page Top of page


HWY 401 Eastbound [ Norwich Ave / Oxford Road 59 (232KM) - Norwich Ave / Oxford Road 59 (232KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Norwich Ave / Oxford Road 59 (232KM)
To:Norwich Ave / Oxford Road 59 (232KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 eastbound and westbound from 1.5 kilometres east of Norwich Avenue (interchange 232) to 1.5 kilometres west of Norwich Avenue (interchange 232) will have a left lane closure from 0900 hours on Thursday, December 14th, 2017, to 0600 hours on December 16th, 2017 for construction purposes
Event Start:December 14, 2017 09:00
Event End:December 15, 2017 19:00
Last Change: Entered 2017-12-12 10:06

Top of page Top of page


HWY 401 Eastbound [ PITT ST - PITT ST ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:PITT ST
To:PITT ST
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Left lane closed Hwy 401 E/B @ Pitt St (Cornwall)
Event Start:December 11, 2017 07:30
Event End:December 15, 2017 16:00
Last Change: Entered 2017-12-06 11:02

Top of page Top of page


HWY 401 Eastbound [ PITT ST - PITT ST ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:PITT ST
To:PITT ST
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Left lane closed Hwy 401 E/B @ Pitt St (Cornwall)
Event Start:December 18, 2017 07:30
Event End:December 22, 2017 16:00
Last Change: Entered 2017-12-14 14:48

Top of page Top of page


HWY 401 Eastbound [ REYNOLDS ROAD - REYNOLDS ROAD ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:REYNOLDS ROAD
To:REYNOLDS ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Right lane closed Hwy 401 E/B west of Reynolds Rd (Gananoque)
Event Start:December 11, 2017 08:00
Event End:December 15, 2017 16:00
Last Change: Entered 2017-12-07 11:24

Top of page Top of page


HWY 401 Eastbound [ SYDENHAM RD (IC 613) - MONTREAL ST (IC 619) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:SYDENHAM RD (IC 613)
To:MONTREAL ST (IC 619)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Alternating nightly lane closures. (Kingston)
Event Start:December 18, 2017 21:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 07:24

Top of page Top of page


HWY 401 Eastbound [ Veterans Memorial Parkway (194KM) - Veterans Memorial Parkway (194KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Veterans Memorial Parkway (194KM)
To:Veterans Memorial Parkway (194KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 at Veterans Memorial Parkway will have lane 3 closures (right lane) in both directions May 17 for approx 6 months
Event Start:May 17, 2017 00:00
Event End:December 17, 2017 00:00
Last Change: Entered 2017-05-17 08:42

Top of page Top of page


HWY 401 Eastbound Collector [ TOMKEN ROAD Collector - RENFORTH DRIVE Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Collector
To:RENFORTH DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun: 1 lane closes at 2100, expanding to 2 lanes at 2300. Full reopen at 0500. Mon-ThU: 1 lane closes at 2200, expanding to 2 lanes at 2300, Full reopen at 0500.
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-14 16:57

Top of page Top of page


HWY 401 Eastbound Collector [ TOMKEN ROAD Collector - RENFORTH DRIVE Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Collector
To:RENFORTH DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00.
Event Start:December 11, 2017 22:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-08 13:12

Top of page Top of page


HWY 401 Eastbound Express [ HWY 10 / HURONTARIO STREET Express - HWY 410 Express ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 10 / HURONTARIO STREET Express
To:HWY 410 Express
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:December 14, 2017 23:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-13 15:11

Top of page Top of page


HWY 401 Eastbound Express [ TOMKEN ROAD Express - RENFORTH DRIVE Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Express
To:RENFORTH DRIVE Express
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 21:00, 2 lane closure at 22:00, 3 lane closure at 23:59. Full reopen at 5:00. Friday: 1 lane closure at 21:00, 2 lane closure at 22:00, 3 lane closure at 23:59. 1 lane reopen at 6:00, 2 lane reopen at 7:00, full reopen at 8:00.
Event Start:December 11, 2017 21:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-08 13:23

Top of page Top of page


HWY 401 Eastbound Express [ TOMKEN ROAD Express - RENFORTH DRIVE Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Express
To:RENFORTH DRIVE Express
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :1 lane closes at 2100, expanding to 2 lanes at 2200, expanding to 3 lanes at 2359. Full reopen at 0500.
Event Start:December 17, 2017 21:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-14 17:01

Top of page Top of page


HWY 401 Eastbound Express [ WARDEN AVE Express - KENNEDY ROAD (SCARBOROUGH) Express ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:WARDEN AVE Express
To:KENNEDY ROAD (SCARBOROUGH) Express
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 13:30

Top of page Top of page


HWY 401 Eastbound On-ramp [ COURTICE ROAD Northbound/Southbound - ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:June 05, 2017 23:00
Event End:December 05, 2018 05:00
Last Change: Entered 2017-05-30 15:24

Top of page Top of page


HWY 401 Eastbound On-ramp [ SIR JOHN A MACDONALD BLVD (IC 615) Eastbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:SIR JOHN A MACDONALD BLVD (IC 615) Eastbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :HWY 401 eastbound on ramp from Sir John A MacDonald will be closed. (Kingston)
Event Start:December 18, 2017 21:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 07:27

Top of page Top of page


HWY 401 Eastbound Transfer [ MIDLAND AVE Collector to Express - ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:MIDLAND AVE Collector to Express
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 13:31

Top of page Top of page


HWY 401 Westbound [ BROCK ST - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:BROCK ST
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from BROCK ST SB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 5:30. Friday: 1 lane closure at 21:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 7:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 8:00, full reopen at 9:00. Sunday: 1 lane closure at 21:00, 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 5:30.
Event Start:December 11, 2017 20:00
Event End:December 18, 2017 05:30
Last Change: Entered 2017-12-07 08:20

Top of page Top of page


HWY 401 Westbound [ BROCK ST - HENRY ST ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:BROCK ST
To:HENRY ST
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 11, 2017 22:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-08 12:32

Top of page Top of page


HWY 401 Westbound [ CURRY HILL RD (IC 825) - MCCONNELL AVE (IC 792) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:CURRY HILL RD (IC 825)
To:MCCONNELL AVE (IC 792)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Intermittent right lane closures Hwy 401 E/B & W/B btwn Curry Hill Rd and McConnell Ave (Cornwall - Lancaster)
Event Start:November 30, 2017 07:00
Event End:December 15, 2017 17:30
Last Change: Entered 2017-11-28 17:34

Top of page Top of page


HWY 401 Westbound [ Dorchester Rd / Middlesex Rd 32 (199KM) - Dorchester Rd / Middlesex Rd 32 (199KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:Dorchester Rd / Middlesex Rd 32 (199KM)
To:Dorchester Rd / Middlesex Rd 32 (199KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 Westbound at Dorchester Road will have a right lane closure from December 11th at 0800 hours until December 15th at 1700 hours
Event Start:December 11, 2017 08:00
Event End:December 15, 2017 17:00
Last Change: Entered 2017-12-07 21:35

Top of page Top of page


HWY 401 Westbound [ GUELPH LINE - HWY 6 SOUTH ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:GUELPH LINE
To:HWY 6 SOUTH
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-07 06:25

Top of page Top of page


HWY 401 Westbound [ GUELPH LINE - HWY 6 SOUTH ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:GUELPH LINE
To:HWY 6 SOUTH
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-14 07:02

Top of page Top of page


HWY 401 Westbound [ HENRY ST - HWY 412 ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:HENRY ST
To:HWY 412
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from HWY 412 NB
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 11, 2017 22:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-08 12:29

Top of page Top of page


HWY 401 Westbound [ HOLT ROAD - COURTICE ROAD ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:HOLT ROAD
To:COURTICE ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Wednesday-Thursday: 1 lane closure at 18:00, 2 lane closure at 22:00. 1 lane reopens at 5:00, full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 5:00, full reopen at 6:00.
Event Start:December 13, 2017 18:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-07 16:26

Top of page Top of page


HWY 401 Westbound [ HWY 137 (IC 661) - HWY 137 (IC 661) ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:HWY 137 (IC 661)
To:HWY 137 (IC 661)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Left lane closures Hwy 401 W/B east of Hwy 137 (Gananoque)
Event Start:December 11, 2017 08:00
Event End:December 15, 2017 16:00
Last Change: Entered 2017-12-07 11:16

Top of page Top of page


HWY 401 Westbound [ HWY 25 - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-14 07:00

Top of page Top of page


HWY 401 Westbound [ HWY 25 - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-07 06:22

Top of page Top of page


HWY 401 Westbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 NB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00. Full reopen at 8:00.
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-07 06:30

Top of page Top of page


HWY 401 Westbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 NB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00. Full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-14 08:30

Top of page Top of page


HWY 401 Westbound [ Highway 24 / Hespeler Rd (282KM) - Highway 8 / King Street E/Shantz Hill Rd (278KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:Highway 24 / Hespeler Rd (282KM)
To:Highway 8 / King Street E/Shantz Hill Rd (278KM)
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from Highway 8 / King Street E/Shantz Hill Rd (278KM) WB, Off-ramp to Highway 8 / King Street E/Shantz Hill Rd (278KM) WB
ReasonRecurring-Construction
Comment :Highway 401 westbound from Hespeler Road to Homer Watson will have nightly alternating lane closures from Tuesday,December 12th, 2017, to Saturday, December 16th, 2017, from 2000 hours to 0600 hours for construction purposes. The westbound on and off ramps from King Street to Highway 401, will also have nightly closures on December 12th & 13th
Event Start:December 12, 2017 19:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-12 09:26

Top of page Top of page


HWY 401 Westbound [ JOHN F. SCOTT RD - CATARAQUI RIVER BRIDGE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:JOHN F. SCOTT RD
To:CATARAQUI RIVER BRIDGE
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Two left lanes closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:30

Top of page Top of page


HWY 401 Westbound [ SIXTH LINE ROAD - JAMES SNOW PKWY ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SIXTH LINE ROAD
To:JAMES SNOW PKWY
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 06:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 06:00. Full reopen at 08:00.
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-07 06:27

Top of page Top of page


HWY 401 Westbound [ SYDENHAM RD (IC 613) - GARDINERS RD/ CTY RD 38 (IC 611) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SYDENHAM RD (IC 613)
To:GARDINERS RD/ CTY RD 38 (IC 611)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Left lane closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:50

Top of page Top of page


HWY 401 Westbound [ SYDENHAM RD (IC 613) - GARDINERS RD/ CTY RD 38 (IC 611) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SYDENHAM RD (IC 613)
To:GARDINERS RD/ CTY RD 38 (IC 611)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Left lane closed. Kingston
Event Start:October 13, 2017 06:00
Event End:December 22, 2017 19:00
Last Change: Entered 2017-12-09 07:18

Top of page Top of page


HWY 401 Westbound [ SYDENHAM RD (IC 613) - GARDINERS RD/ CTY RD 38 (IC 611) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SYDENHAM RD (IC 613)
To:GARDINERS RD/ CTY RD 38 (IC 611)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Right lane closed. Kingston
Event Start:December 18, 2017 19:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-09 06:41

Top of page Top of page


HWY 401 Westbound [ THICKSON ROAD - THICKSON ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:THICKSON ROAD
To:THICKSON ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-15 08:49

Top of page Top of page


HWY 401 Westbound [ Wallbridge Loyalist Rd (IC 538) - Aikens Rd ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:Wallbridge Loyalist Rd (IC 538)
To:Aikens Rd
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:December 20, 2017 07:00
Event End:December 20, 2017 12:00
Last Change: Entered 2017-12-15 10:29

Top of page Top of page


HWY 401 Westbound Collector Off-ramp [ - HWY 400/BLACK CREEK DRIVE Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 400/BLACK CREEK DRIVE Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-14 06:55

Top of page Top of page


HWY 401 Westbound Collector [ BAYVIEW AVE Collector - BAYVIEW AVE Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:BAYVIEW AVE Collector
To:BAYVIEW AVE Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from BAYVIEW AVE NB/SB
ReasonRecurring-Construction
Comment :
Event Start:December 15, 2017 22:00
Event End:December 16, 2017 09:00
Last Change: Entered 2017-12-14 06:50

Top of page Top of page


HWY 401 Westbound Collector [ VICTORIA PARK AVE Collector - HWY 404 Collector ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:VICTORIA PARK AVE Collector
To:HWY 404 Collector
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 404 NB
ReasonConstruction
Comment :
Event Start:December 16, 2017 22:00
Event End:December 17, 2017 08:00
Last Change: Entered 2017-12-14 08:33

Top of page Top of page


HWY 401 Westbound Collector [ VICTORIA PARK AVE Collector - HWY 404 Collector ] - Construction
Highway:HWY 401
Direction:Westbound
From/At:VICTORIA PARK AVE Collector
To:HWY 404 Collector
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 404 NB
ReasonConstruction
Comment :
Event Start:December 15, 2017 22:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-13 10:31

Top of page Top of page


HWY 401 Westbound Express [ BRIMLEY ROAD Express - BRIMLEY ROAD Express ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:BRIMLEY ROAD Express
To:BRIMLEY ROAD Express
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Sunday: 1 lane closure at 22:00, 2 lane closure at 23:59. Full reopen at 5:00. No two consecutive on/off ramps or transfers will be closed simultaneously.
Event Start:December 17, 2017 22:00
Event End:December 18, 2017 05:00
Last Change: Entered 2017-12-13 16:01

Top of page Top of page


HWY 401 Westbound Express [ RENFORTH DRIVE Express - DIXIE ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:RENFORTH DRIVE Express
To:DIXIE ROAD Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closes at 2100, expanding to 2 lanes at 2300. 1 lane reopens at 0500, full reopen at 0530.
Event Start:December 17, 2017 21:00
Event End:December 22, 2017 05:30
Last Change: Entered 2017-12-14 17:07

Top of page Top of page


HWY 401 Westbound Express [ RENFORTH DRIVE Express - DIXIE ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:RENFORTH DRIVE Express
To:DIXIE ROAD Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 21:00, 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 5:30. Friday: 1 lane closure at 21:00, 2 lane closure at 23:00. 1 lane reopen at 8:00, full reopen at 9:00.
Event Start:December 11, 2017 21:00
Event End:December 16, 2017 05:30
Last Change: Entered 2017-12-08 13:28

Top of page Top of page


HWY 401 Westbound Off-ramp [ - BENNETT ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:BENNETT ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:02

Top of page Top of page


HWY 401 Westbound Off-ramp [ - COURTICE ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:COURTICE ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:21

Top of page Top of page


HWY 401 Westbound Off-ramp [ - HARMONY ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:HARMONY ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:14

Top of page Top of page


HWY 401 Westbound Off-ramp [ - LIBERTY ST Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:LIBERTY ST Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:07

Top of page Top of page


HWY 401 Westbound Off-ramp [ - RITSON ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:RITSON ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:18

Top of page Top of page


HWY 401 Westbound Off-ramp [ - STEVENSON ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:STEVENSON ROAD Northbound/Southbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:24

Top of page Top of page


HWY 401 Westbound Off-ramp [ - WAVERLY ROAD Northbound/Southbound ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:
To:WAVERLY ROAD Northbound/Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:12

Top of page Top of page


HWY 401 Westbound On-ramp [ BENNETT ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:BENNETT ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:05

Top of page Top of page


HWY 401 Westbound On-ramp [ BROCK ROAD Northbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:BROCK ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 23:59
Event End:December 21, 2017 05:00
Last Change: Entered 2017-12-15 08:46

Top of page Top of page


HWY 401 Westbound On-ramp [ COURTICE ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:COURTICE ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:23

Top of page Top of page


HWY 401 Westbound On-ramp [ HARMONY ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:HARMONY ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:16

Top of page Top of page


HWY 401 Westbound On-ramp [ HOLT ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:HOLT ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:19

Top of page Top of page


HWY 401 Westbound On-ramp [ LIBERTY ST Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:LIBERTY ST Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:08

Top of page Top of page


HWY 401 Westbound On-ramp [ RITSON ROAD Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:RITSON ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:19

Top of page Top of page


HWY 401 Westbound On-ramp [ SIMCOE ST Northbound/Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:SIMCOE ST Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:22

Top of page Top of page


HWY 401 Westbound On-ramp [ STEVENSON ROAD Northbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:STEVENSON ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:25

Top of page Top of page


HWY 401 Westbound On-ramp [ STEVENSON ROAD Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:STEVENSON ROAD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-12 09:27

Top of page Top of page


HWY 401 Westbound On-ramp [ WAVERLY ROAD Northbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:WAVERLY ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:16

Top of page Top of page


HWY 401 Westbound On-ramp [ WAVERLY ROAD Southbound - ] - Recurring-Engineering Investigation
Highway:HWY 401
Direction:Westbound
From/At:WAVERLY ROAD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-11 12:13

Top of page Top of page


HWY 403 HAMILTON Westbound [ YORK BLVD - YORK BLVD ] - Recurring-Construction
Highway:HWY 403 HAMILTON
Direction:Westbound
From/At:YORK BLVD
To:YORK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to YORK BLVD EB
ReasonRecurring-Construction
Comment :1 lane closes at 2200, expanding to 2 lanes at 2300. 1 lane reopens at 0500, full reopen at 0600.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 07:00
Last Change: Entered 2017-12-15 06:37

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ EGLINTON AVE Collector - MATHESON BLVD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:EGLINTON AVE Collector
To:MATHESON BLVD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from EGLINTON AVE EB, On-ramp from EGLINTON AVE WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:45

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ ERIN MILLS PKWY Collector - MAVIS ROAD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:ERIN MILLS PKWY Collector
To:MAVIS ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-14 17:24

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ ERIN MILLS PKWY Collector - MAVIS ROAD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:ERIN MILLS PKWY Collector
To:MAVIS ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-06 16:36

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ HWY 407 ETR Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:HWY 407 ETR Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sun-Thu: HOV lane closes at 2000, expanding to 2 lanes at 2200, expanding to 3 lanes at 0100. 1 lane reopens at 0400, full reopen at 0500.
Event Start:December 17, 2017 20:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-14 17:12

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ HWY 407 ETR Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:HWY 407 ETR Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 20:00, 2 lane closure at 22:00, 3 lane closure at 1:00. 1 lane reopen at 4:00, full reopen at 5:00. Friday: 1 lane closure at 20:00, 2 lane closure at 23:00, 3 lane closure at 1:00. Full reopen at 5:00.
Event Start:December 10, 2017 20:00
Event End:December 16, 2017 05:00
Last Change: Entered 2017-12-06 16:24

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ ERIN MILLS PKWY Collector - HWY 407 ETR Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:ERIN MILLS PKWY Collector
To:HWY 407 ETR Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 20:00, 2 lane closure at 23:00, 3 lane closure at 1:00. 1 lane reopen at 4:00, full reopen at 6:00. Friday: 1 lane closure at 20:00, 2 lane closure at 23:59, 3 lane closure at 1:00. 1 lane reopen at 5:00, full reopen at 6:00.
Event Start:December 10, 2017 20:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-06 16:15

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ ERIN MILLS PKWY Collector - HWY 407 ETR Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:ERIN MILLS PKWY Collector
To:HWY 407 ETR Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sun-Thu: HOV closes at 2000, expanding to 2 lanes at 2300, expanding to 3 lanes at 0100. 1 lane reopens at 0400. Full reopen at 0600.
Event Start:December 17, 2017 20:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 17:08

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:1 Left(with HOV) Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 20:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 17:14

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:3 Right Lane(s)
Traffic Impact :On-ramp from EASTGATE DRIVE NB/SB
ReasonRecurring-Construction
Comment :1 lane closes at 2300, expanding to 2 lanes at 2359, expanding to 3 lanes at 0100. 1 lane reopens at 0400, 2 lanes reopen at 0530, full reopen at 0600.
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 17:21

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:3 Right Lane(s)
Traffic Impact :On-ramp from EASTGATE DRIVE NB/SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 23:00, 2 lane closure at 23:59, 3 lane closure at 1:00. 1 lane reopen at 4:00, 2 lane reopen at 5:30, full reopen at 6:00. Friday: 1 lane closure at 23:59, 2 lane closure at 1:00, 3 lane closure at 2:00. 1 lane reopen at 5:00, 2 lane reopen 5:30, full reopen at 6:00.
Event Start:December 10, 2017 23:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-06 16:34

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:1 Left(with HOV) Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 10, 2017 20:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-06 16:26

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MAVIS ROAD Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MAVIS ROAD Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 10, 2017 23:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-06 16:38

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MAVIS ROAD Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MAVIS ROAD Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 17:25

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Off-ramp [ - ERIN MILLS PKWY Northbound ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:
To:ERIN MILLS PKWY Northbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 11, 2017 10:00
Event End:December 22, 2017 15:00
Last Change: Entered 2017-11-30 11:09

Top of page Top of page


HWY 404 Northbound [ MAJOR MACKENZIE DRIVE - STOUFFVILLE ROAD ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:MAJOR MACKENZIE DRIVE
To:STOUFFVILLE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from STOUFFVILLE ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00. Full reopen at 6:00. Monday-Thursday: 1 lane closure at 22:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00. Full reopen at 8:00.
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 08:00
Last Change: Entered 2017-12-06 19:04

Top of page Top of page


HWY 404 Northbound [ MAJOR MACKENZIE DRIVE - STOUFFVILLE ROAD ] - Recurring-Engineering Investigation
Highway:HWY 404
Direction:Northbound
From/At:MAJOR MACKENZIE DRIVE
To:STOUFFVILLE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from STOUFFVILLE ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB
ReasonRecurring-Engineering Investigation
Comment :Sunday: 1 lane closure at 23:00. Full reopen at 6:00. Monday-Thursday: 1 lane closure at 22:00. Full reopen at 6:00. Friday: 1 lane closure at 23:59. Full reopen at 8:00.
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 08:00
Last Change: Entered 2017-12-13 18:40

Top of page Top of page


HWY 404 Southbound [ STOUFFVILLE ROAD - MAJOR MACKENZIE DRIVE ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:STOUFFVILLE ROAD
To:MAJOR MACKENZIE DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from STOUFFVILLE ROAD EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB, Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 18:44

Top of page Top of page


HWY 404 Southbound [ STOUFFVILLE ROAD - MAJOR MACKENZIE DRIVE ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:STOUFFVILLE ROAD
To:MAJOR MACKENZIE DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB, On-ramp from STOUFFVILLE ROAD EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00. Full reopen at 5:00. Monday: 1 lane closure at 20:00. Full reopen at 5:00. Tuesday-Thursday: 1 lane closure at 21:00. Full reopen at 5:00. Friday: 1 lane closure at 21:00. Full reopen at 8:00.
Event Start:December 10, 2017 20:00
Event End:December 16, 2017 08:00
Last Change: Entered 2017-12-06 19:05

Top of page Top of page


HWY 406 Northbound [ GIBSON LAKE BRIDGE - GLENDALE AVE ] - Recurring-Construction
Highway:HWY 406
Direction:Northbound
From/At:GIBSON LAKE BRIDGE
To:GLENDALE AVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 23, 2017 00:00
Last Change: Entered 2017-12-13 16:52

Top of page Top of page


HWY 406 Northbound Off-ramp [ - HWY 58 Southbound ] - Recurring-Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:HWY 58 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 10, 2017 22:00
Event End:December 16, 2017 06:00
Last Change: Entered 2017-12-07 14:11

Top of page Top of page


HWY 406 Northbound Off-ramp [ - HWY 58 Southbound ] - Recurring-Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:HWY 58 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 22:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-13 17:08

Top of page Top of page


HWY 406 Northbound Off-ramp [ - ST DAVID'S ROAD Westbound ] - Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:ST DAVID'S ROAD Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Permanently closed until December 22, 2017.
Event Start:November 18, 2017 00:00
Event End:December 22, 2017 23:59
Last Change: Entered 2017-11-16 11:06

Top of page Top of page


HWY 406 Southbound [ GLENDALE AVE - BEAVERDAMS ROAD ] - Recurring-Construction
Highway:HWY 406
Direction:Southbound
From/At:GLENDALE AVE
To:BEAVERDAMS ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 10, 2017 00:00
Event End:December 16, 2017 00:00
Last Change: Entered 2017-12-07 14:08

Top of page Top of page


HWY 406 Southbound [ GLENDALE AVE - BEAVERDAMS ROAD ] - Recurring-Construction
Highway:HWY 406
Direction:Southbound
From/At:GLENDALE AVE
To:BEAVERDAMS ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 00:00
Event End:December 23, 2017 00:00
Last Change: Entered 2017-12-13 16:23

Top of page Top of page


HWY 407 ETR Eastbound [ RITSON RD N - HARMONY RD N ] - Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:RITSON RD N
To:HARMONY RD N
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 21, 2017 15:00
Event End:January 02, 2018 12:00
Last Change: Entered 2017-11-16 13:25

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:CLARK BLVD
To:QUEEN STREET/S JCT HWY 7
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 6:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-13 15:46

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:COURTNEY PARK DRIVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to DERRY ROAD EB/WB, Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:54

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:DERRY ROAD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:48

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :Sunday to Thursday: 2 lane closure at 23:59. Full reopen at 05:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:55

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:STEELES AVE
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to CLARK BLVD EB/WB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23:59. Full reopen at 06:00. Monday-Wednesday: 2 lane closure at 23:00. Full reopen at 06:00. Thursday: 2 lane closure at 23:00. 1 lane reopen at 05:00, full reopen at 06:00.
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-13 15:47

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:CLARK BLVD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:39

Top of page Top of page


HWY 410 Southbound [ COURTNEY PARK DRIVE - HWY 401 ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:COURTNEY PARK DRIVE
To:HWY 401
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23.59. Full reopen at 05:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 05:00.
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:43

Top of page Top of page


HWY 410 Southbound [ DERRY ROAD - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:DERRY ROAD
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from COURTNEY PARK DRIVE EB/WB, On-ramp from DERRY ROAD WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:42

Top of page Top of page


HWY 410 Southbound [ QUEEN STREET/S JCT HWY 7 - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:QUEEN STREET/S JCT HWY 7
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from CLARK BLVD EB/WB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59 and full reopen at 05:00.
Event Start:December 17, 2017 23:59
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:38

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:STEELES AVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23:59. Full reopen at 05:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 05:00.
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 05:00
Last Change: Entered 2017-12-13 15:41

Top of page Top of page


HWY 417 Eastbound [ PARKDALE AVE (IC 122) - ROCHESTER ST (IC 121B) ] - Maintenance
Highway:HWY 417
Direction:Eastbound
From/At:PARKDALE AVE (IC 122)
To:ROCHESTER ST (IC 121B)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Short duration right lane closures Hwy 417 E/B & W/B btwn Parkdale and Rochester (Ottawa)
Event Start:December 16, 2017 06:00
Event End:December 16, 2017 10:00
Last Change: Entered 2017-12-14 14:22

Top of page Top of page


HWY 417 Eastbound [ ST. ALBERT RD (IC 66) - DUNVEGAN RD ] - Recurring-Engineering Investigation
Highway:HWY 417
Direction:Eastbound
From/At:ST. ALBERT RD (IC 66)
To:DUNVEGAN RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Left lane closures Hwy 417 E/B & W/B btwn St. Albert Rd and Dunvegan Rd (Cassleman)
Event Start:December 11, 2017 08:00
Event End:December 15, 2017 16:00
Last Change: Entered 2017-12-06 10:07

Top of page Top of page


HWY 417 Eastbound [ ST. ALBERT RD (IC 66) - DUNVEGAN RD ] - Recurring-Engineering Investigation
Highway:HWY 417
Direction:Eastbound
From/At:ST. ALBERT RD (IC 66)
To:DUNVEGAN RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Left lane closures Hwy 417 E/B & W/B btwn St. Albert Rd and Dunvegan Rd (Cassleman)
Event Start:December 18, 2017 08:00
Event End:December 21, 2017 16:00
Last Change: Entered 2017-12-06 10:38

Top of page Top of page


HWY 417 Eastbound [ WALKLEY RD (IC 110) - HUNT CLUB RD (IC109) ] - Maintenance
Highway:HWY 417
Direction:Eastbound
From/At:WALKLEY RD (IC 110)
To:HUNT CLUB RD (IC109)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Short duration right lane closures Hwy 417 E/B & W/B btwn Walkley and Hunt Club (Ottawa)
Event Start:December 16, 2017 06:00
Event End:December 16, 2017 10:00
Last Change: Entered 2017-12-14 14:26

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Northbound ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:
To:QEW Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 18, 2017 00:00
Event End:April 30, 2018 23:59
Last Change: Entered 2017-11-17 09:10

Top of page Top of page


HWY 420 Westbound On-ramp [ DORCHESTER ROAD/LUNDY'S LANE Westbound - ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:DORCHESTER ROAD/LUNDY'S LANE Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 18, 2017 00:00
Event End:April 30, 2018 23:59
Last Change: Entered 2017-11-17 09:13

Top of page Top of page


HWY 6 Northbound [ Grey Road 17 - Grey Road 17 ] - Recurring-Construction
Highway:HWY 6
Direction:Northbound
From/At:Grey Road 17
To:Grey Road 17
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:October 02, 2017 07:00
Event End:November 06, 2018 19:00
Last Change: Entered 2017-09-29 16:29

Top of page Top of page


HWY 6 Northbound [ King Street / Haldimand Road 20 - Mississauga Road / Haldimand 1st Line ] - Recurring-Construction
Highway:HWY 6
Direction:Northbound
From/At:King Street / Haldimand Road 20
To:Mississauga Road / Haldimand 1st Line
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 6 (northbound and southbound) from the north limit of Hagersville to 0.3 kilometres north of First Line will be having alternating daily lane restrictions as required with use of flagmen and/or temporary traffic signals. Project duration is July 4, 2017 to December 2017, Lane restrictions are permitted Monday to Friday 00:00 hours to 16:00 hours and 18:00 hours to 24:00 hours (no night work is currently scheduled).
Event Start:July 10, 2017 00:00
Event End:December 31, 2017 23:59
Last Change: Entered 2017-07-10 10:49

Top of page Top of page


HWY 6/21 Northbound [ Highway 6 / County Road 18 - Nichol's Gully Road / 9th Ave West ] - Recurring-Construction
Highway:HWY 6/21
Direction:Northbound
From/At:Highway 6 / County Road 18
To:Nichol's Gully Road / 9th Ave West
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 6/21 from west of Grey Road 18 to east of 9 Ave (Owen Sound) will have daily short duration alternating lane closures from Tuesday December 12th 2017, to Friday December 15th, 2017, from 0800 hours to 1700 hours, for construction purposes
Event Start:December 12, 2017 08:00
Event End:December 15, 2017 17:00
Last Change: Entered 2017-12-11 10:22

Top of page Top of page


HWY 8 Eastbound [ Cambria Road - Stratford City Limits (north) / O'Loane Ave ] - Recurring-Maintenance
Highway:HWY 8
Direction:Eastbound
From/At:Cambria Road
To:Stratford City Limits (north) / O'Loane Ave
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Lane closure affects both directions of Highway 8.
Event Start:December 11, 2017 06:30
Event End:December 15, 2017 19:00
Last Change: Entered 2017-12-09 09:24

Top of page Top of page


HWY 9 Westbound [ WEST CANAL BANK ROAD - KING TWP CONCESSION 8 ] - Recurring-Construction
Highway:HWY 9
Direction:Westbound
From/At:WEST CANAL BANK ROAD
To:KING TWP CONCESSION 8
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 21:00. Full reopen at 7:00. Monday-Thursday: 1 lane closure at 19:00. Full reopen at 7:00. Friday: 1 lane closure at 21:00. Full reopen at 7:00.
Event Start:December 10, 2017 19:00
Event End:December 16, 2017 07:00
Last Change: Entered 2017-12-07 14:31

Top of page Top of page


QEW Fort Erie Bound [ DORVAL DRIVE - DORVAL DRIVE ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:DORVAL DRIVE
To:DORVAL DRIVE
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 17, 2017 23:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-14 10:04

Top of page Top of page


QEW Fort Erie Bound [ MCLEOD ROAD - MCLEOD ROAD ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:MCLEOD ROAD
To:MCLEOD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MCLEOD ROAD WB, Off-ramp to MCLEOD ROAD EB/WB
ReasonRecurring-Construction
Comment :
Event Start:December 13, 2017 20:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-12 20:03

Top of page Top of page


QEW Fort Erie Bound [ NORTHSHORE BLVD/HWY 2 - BURLINGTON SKYWAY ] - Recurring-Maintenance
Highway:QEW
Direction:Fort Erie Bound
From/At:NORTHSHORE BLVD/HWY 2
To:BURLINGTON SKYWAY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from NORTHSHORE BLVD/HWY 2 EB/WB
ReasonRecurring-Maintenance
Comment :
Event Start:December 17, 2017 21:00
Event End:December 23, 2017 06:00
Last Change: Entered 2017-12-13 13:49

Top of page Top of page


QEW Fort Erie Bound On-ramp [ FAIRVIEW STREET/PLAINS ROAD Westbound - ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:FAIRVIEW STREET/PLAINS ROAD Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:December 15, 2017 23:59
Event End:December 20, 2017 05:00
Last Change: Entered 2017-12-09 06:56

Top of page Top of page


QEW Toronto bound [ HWY 420 - HWY 420 ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:HWY 420
To:HWY 420
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:December 12, 2017 00:00
Event End:December 22, 2017 23:59
Last Change: Entered 2017-12-08 16:10

Top of page Top of page


QEW Toronto bound [ MCLEOD ROAD - MCLEOD ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:MCLEOD ROAD
To:MCLEOD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MCLEOD ROAD WB, Off-ramp to MCLEOD ROAD EB/WB
ReasonRecurring-Construction
Comment :
Event Start:December 13, 2017 20:00
Event End:December 22, 2017 06:00
Last Change: Entered 2017-12-12 20:00

Top of page Top of page


QEW Toronto bound [ THOMPSON ROAD - THOMPSON ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:THOMPSON ROAD
To:THOMPSON ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to THOMPSON ROAD SB
ReasonRecurring-Construction
Comment :
Event Start:December 13, 2017 14:00
Event End:December 22, 2017 12:00
Last Change: Entered 2017-12-12 20:06

Top of page Top of page


HWY 11 Northbound [ TONOMO LAKE RD(W) - ] - Other
Highway:HWY 11
Direction:Northbound
From/At:TONOMO LAKE RD(W)
To:
Lanes Affected: lane and Northbound shoulder blocked
Traffic Impact :
ReasonOther
Comment :HWY 11 REDUCED TO ONE LANE IN THE TEMAGAMI AREA. UPDATED DECEMBER 15TH AT 1130 HRS
Event Start:December 15, 2017 10:01
Event End:
Last Change: Updated 2017-12-15 11:26

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Off-ramp [ - MAVIS ROAD ] - Collision
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:
To:MAVIS ROAD
Lanes Affected:All lanes blocked
Traffic Impact :
ReasonCollision
Comment :
Event Start:December 15, 2017 11:46
Event End:
Last Change: Updated 2017-12-15 11:57

Top of page Top of page


HWY 406 Northbound Off-ramp [ - MERRITT ROAD ] - Collision
Highway:HWY 406
Direction:Northbound
From/At:
To:MERRITT ROAD
Lanes Affected:All lanes blocked
Traffic Impact :
ReasonCollision
Comment :
Event Start:December 15, 2017 12:23
Event End:
Last Change: Entered 2017-12-15 12:23

Top of page Top of page


HWY 537 Southbound [ CROSS RD-CLELAND TWP - S JCT ST CLOUD RD-CLELAND TWP ] - Flooding
Highway:HWY 537
Direction:Southbound
From/At:CROSS RD-CLELAND TWP
To:S JCT ST CLOUD RD-CLELAND TWP
Lanes Affected: lane and Southbound shoulder blocked
Traffic Impact :
ReasonFlooding
Comment :HWY 537 REDUCED TO SINGLE LANE IN WAHNAPITAE FROM CROSS RD TO ST.CLOUD RD - JUMBO CREEK - UPDATED DECEMBER 15TH AT 1130 HRS.
Event Start:November 16, 2017 13:16
Event End:
Last Change: Updated 2017-12-15 11:26

Top of page Top of page


HWY 593 Southbound [ DEVON TWP ROAD 4 SOUTH (E) - ] - Other
Highway:HWY 593
Direction:Southbound
From/At:DEVON TWP ROAD 4 SOUTH (E)
To:
Lanes Affected: lane blocked
Traffic Impact :
ReasonOther
Comment :Hwy 593 Kakabeka approx 27 km south of Hwy 588 Jct the south bound lane will be bllocked for mobile brushing operations. Traffic control is in place. Please use caution in the area.
Event Start:December 15, 2017 10:13
Event End:
Last Change: Entered 2017-12-15 10:13

Top of page Top of page


HWY 593 Southbound [ SEC HWY 588 (END OF HWY) - ] - Other
Highway:HWY 593
Direction:Southbound
From/At:SEC HWY 588 (END OF HWY)
To:
Lanes Affected: lane blocked
Traffic Impact :
ReasonOther
Comment :Hwy 593 Kakabeka approx 3 km south of Hwy 588 Jct lanes will be alternated for brushing operations. Traffic control is in place. Please use caution in the area.
Event Start:December 15, 2017 10:12
Event End:
Last Change: Entered 2017-12-15 10:12

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.

Road information by phone




Random Weather Facts

Recycling
In 2006, a record 53.4 percent of the paper consumed in the U.S. was recovered for recycling. Americans recovered an extraordinary 53.5 million tons, averaging 360 pounds per person.