Interactive Map

Road closure, condition and construction information is available through our hands free 511 automated service or on Twitter! Simply dial 511 or follow us @511Ontario!

Loading... please wait
Loading... please wait

Select information to display on map:

Hide/show control panel

Legend


Reports by Region: Northwestern  Northeastern  Eastern  Central  Southwestern

Last updated: 2017-11-22 - night report

Eastern Ontario Road Conditions
Highways Area Road Condition Last Updated

Eastern (file generated at 2:17 AM)
115 Highway 35/115 to Highway 7 - Peterborough bare and wet road 2017-11-22 1:40
118 Paudash to Loon Lake bare and wet road 2017-11-22 1:40
127 Maynooth to Hastings/Nipissing County Line bare and wet road with partly ice covered sections. 2017-11-22 1:40
132 Renfrew to Highway 41 bare and dry road with bare and wet road sections. 2017-11-22 1:40
28 Highway 7 to Burleigh Falls bare and wet road 2017-11-22 1:40
28 Burleigh Falls to Apsley bare and wet road 2017-11-22 1:40
28 Apsley to Town of Bancroft bare and wet road 2017-11-22 1:40
28 Town of Bancroft to Detlor Road bare and wet road 2017-11-22 1:40
28 Detlor Road to Denbigh bare and wet road with partly ice covered sections. 2017-11-22 1:40
33 Bloomfield to Glenora Ferry bare and wet road 2017-11-22 1:40
35 Junction highway 35/115 to Junction highway 7A bare and wet road 2017-11-22 1:40
35 Junction highway 7A to Lindsay bare and wet road 2017-11-22 1:40
35 Lindsay to Victoria County / Haliburton District bare and wet road 2017-11-22 1:40
37 Belleville to Tweed bare and wet road 2017-11-22 1:40
37 Tweed to Highway 7 bare and wet road 2017-11-22 1:40
401 Quinte Road 33 - Interchange 525 to Kingston bare and dry road 2017-11-22 1:40
401 CLARINGTON East Limits to Quinte Road 33 - Interchange 525 bare and wet road 2017-11-22 1:40
41 Napanee to Highway 401 bare and dry road 2017-11-22 1:40
41 Kaladar to Bon Echo Park bare and wet road with partly ice covered sections. 2017-11-22 1:40
41 Bon Echo Park to Denbigh bare and wet road with partly ice covered sections. 2017-11-22 1:40
41 Denbigh to Khartun bare and wet road with partly ice covered sections. 2017-11-22 1:40
41 Khartun to Grattan Road bare and wet road with bare and dry road sections. 2017-11-22 1:40
41 Grattan Road to Eganville bare and wet road with bare and dry road sections. 2017-11-22 1:40
41 Eganville to Pembroke bare and dry road with bare and wet road sections. 2017-11-22 1:40
49 Marysville to Tyendinaga Township Road 31 bare and dry road 2017-11-22 1:40
60 Renfrew to Eganville bare and dry road with bare and wet road sections. 2017-11-22 1:40
60 Eganville to Killaloe bare and dry road with bare and wet road sections. 2017-11-22 1:40
60 Killaloe to Madawaska bare and dry road with bare and wet road sections. 2017-11-22 1:40
62 Bloomfield to Belleville bare and wet road 2017-11-22 1:40
62 Belleville to Thurlow bare and dry road 2017-11-22 1:40
62 Thurlow to Madoc bare and wet road 2017-11-22 1:40
62 Madoc to Eldorado bare and wet road 2017-11-22 1:40
62 Eldorado to Bancroft bare and wet road 2017-11-22 1:40
62 Bancroft to Maynooth bare and wet road with partly ice covered sections. 2017-11-22 1:40
7 Lanark to Perth bare and wet road 2017-11-22 1:40
7 Kennebec to Lanark bare and wet road 2017-11-22 1:40
7 Kaladar to Kennebec bare and wet road 2017-11-22 1:40
7 Madoc to Kaladar bare and wet road 2017-11-22 1:40
7 Havelock to Madoc bare and wet road 2017-11-22 1:40
7 Otonabee to Havelock bare and wet road 2017-11-22 1:40
7 Highway 28 to Otonabee bare and wet road 2017-11-22 1:40
7 Junction highway 7 & 115 to Highway 28 bare and wet road 2017-11-22 1:40
7 Omemee to Junction highway 7 & 115 bare and wet road 2017-11-22 1:40
7 North Junction Highway 12 to Omemee bare and wet road 2017-11-22 1:40
7025 Shrine Hill Drive to Hillcrest Avenue bare and dry road with bare and wet road sections. 2017-11-22 1:40
7A Highway 35 to Cavan bare and wet road 2017-11-22 1:40
7A Nesbitt Road - Blackstock to Highway 35 bare and wet road 2017-11-22 1:40
1000 Highway 2 to Highway 401 bare and wet road 2017-11-22 2:07
137 Canada / USA Border to Highway 401 bare and wet road 2017-11-22 2:07
138 Cornwall to Highway 417 bare and wet road 2017-11-22 2:07
148 Ontario Quebec Border to Pembroke bare and dry road with bare and wet road sections. 2017-11-22 2:07
15 Highway 401 to Smith Falls bare and wet road 2017-11-22 2:07
15 Smith Falls to Carleton Place bare and wet road 2017-11-22 2:07
16 Johnstown to Highway 416 bare and wet road 2017-11-22 2:07
17 Arnprior to END HWY 417 bare and wet road 2017-11-22 2:07
17 END HWY 417 to Cobden bare and wet road 2017-11-22 2:07
17 Cobden to Chalk River bare and dry road with bare and wet road sections. 2017-11-22 2:07
17 Chalk River to Deux Rivieres bare and dry road 2017-11-22 2:07
2 Gananoque to Highway 2 & Thousand Island Parkway bare and wet road 2017-11-22 2:07
33 Glenora Ferry to Collins Bay Road bare and wet road 2017-11-22 2:07
34 Highway 417 to Hawkesbury bare and wet road 2017-11-22 2:07
401 Johnstown to Quebec Border bare and wet road 2017-11-22 2:07
401 Maitland to Johnstown bare and wet road 2017-11-22 2:07
401 Lansdowne to Maitland bare and wet road 2017-11-22 2:07
401 Kingston to Lansdowne bare and wet road 2017-11-22 2:07
416 Highway 401 to Fallowfield Road bare and wet road 2017-11-22 2:07
416 Fallowfield Road to Highway 417 bare and wet road 2017-11-22 2:07
417 Quebec Border to Highway 138 bare and wet road 2017-11-22 2:07
417 Highway 138 to Gloucester bare and wet road 2017-11-22 2:07
417 Gloucester to Fitzroy bare and wet road 2017-11-22 2:07
417 Fitzroy to Arnprior bare and wet road 2017-11-22 2:07
7 Perth to Junction highway 417 & 17 bare and wet road 2017-11-22 2:07

Unscheduled road closures and events for provincial highways:

Unscheduled Events

HWY 10 Southbound [ 15 Sideroad / County Road 8 (Mono Centre Road) - 4th Ave ] - Recurring-Construction
Highway:HWY 10
Direction:Southbound
From/At:15 Sideroad / County Road 8 (Mono Centre Road)
To:4th Ave
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 10 northbound alternating southbound, between Mono Sideroad 15 and 4th Avenue, Camilla / Orangeville, at various locations, reduced to a single lane of traffic, Monday, November 20th, 2017 until Friday, November 24th, 2017, daily, from 0000 hours until 1700 hours, for construction work operations, weather permitting.
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 17:00
Last Change: Entered 2017-11-17 18:09

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 26, 2017 00:00
Event End:December 02, 2017 23:59
Last Change: Entered 2017-11-21 12:47

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 27, 2017 00:00
Event End:November 27, 2017 14:00
Last Change: Entered 2017-11-21 12:49

Top of page Top of page


HWY 11 Northbound [ HWY 400 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:HWY 400
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:38

Top of page Top of page


HWY 11 Northbound [ LINE 11 - LINE 11 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Northbound
From/At:LINE 11
To:LINE 11
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 23, 2017 15:00
Last Change: Entered 2017-11-15 10:34

Top of page Top of page


HWY 11 Northbound [ LINE 9 - LINE 9 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Northbound
From/At:LINE 9
To:LINE 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 23, 2017 15:00
Last Change: Entered 2017-11-15 10:32

Top of page Top of page


HWY 11 Northbound [ SHOREVIEW DRIVE - SIMCOE ROAD 169 ] - Recurring-Construction
Highway:HWY 11
Direction:Northbound
From/At:SHOREVIEW DRIVE
To:SIMCOE ROAD 169
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from TRENT CANAL BRIDGE/SEVERN RIVER NB/SB, On-ramp from TRENT CANAL BRIDGE/SEVERN RIVER NB/SB, Off-ramp to SIMCOE ROAD 169 NB/SB, Off-ramp to SIMCOE ROAD 169 NB/SB, Off-ramp to TRENT CANAL BRIDGE/SEVERN RIVER NB/SB, Off-ramp to TRENT CANAL BRIDGE/SEVERN RIVER NB/SB
ReasonRecurring-Construction
Comment :
Event Start:November 21, 2017 00:00
Event End:November 26, 2017 23:59
Last Change: Entered 2017-11-17 16:37

Top of page Top of page


HWY 11 Northbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - TOWNLINE ROAD 12-13 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Northbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:TOWNLINE ROAD 12-13
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-15 10:49

Top of page Top of page


HWY 11 Southbound [ LINE 11 - LINE 11 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Southbound
From/At:LINE 11
To:LINE 11
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 23, 2017 15:00
Last Change: Entered 2017-11-15 10:35

Top of page Top of page


HWY 11 Southbound [ LINE 9 - LINE 9 ] - Recurring-Maintenance
Highway:HWY 11
Direction:Southbound
From/At:LINE 9
To:LINE 9
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 23, 2017 15:00
Last Change: Entered 2017-11-15 10:33

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 169 - SHOREVIEW DRIVE ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 169
To:SHOREVIEW DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from SIMCOE ROAD 169 NB/SB, On-ramp from SIMCOE ROAD 169 NB/SB
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 26, 2017 23:59
Last Change: Entered 2017-11-17 16:43

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 01, 2017 00:00
Event End:December 01, 2017 13:00
Last Change: Entered 2017-11-21 12:55

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:43

Top of page Top of page


HWY 11 Southbound [ SIMCOE ROAD 93/PENETANGUISHENE ROAD - HWY 400 ] - Recurring-Construction
Highway:HWY 11
Direction:Southbound
From/At:SIMCOE ROAD 93/PENETANGUISHENE ROAD
To:HWY 400
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 26, 2017 00:00
Event End:December 02, 2017 23:59
Last Change: Entered 2017-11-21 12:51

Top of page Top of page


HWY 11 Southbound [ TOWNLINE ROAD 12-13 - SIMCOE ROAD 93/PENETANGUISHENE ROAD ] - Recurring-Maintenance
Highway:HWY 11
Direction:Southbound
From/At:TOWNLINE ROAD 12-13
To:SIMCOE ROAD 93/PENETANGUISHENE ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-15 10:50

Top of page Top of page


HWY 12 Northbound [ HWY 48 SOUTH JCT - DURHAM ROAD 50 ] - Recurring-Construction
Highway:HWY 12
Direction:Northbound
From/At:HWY 48 SOUTH JCT
To:DURHAM ROAD 50
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 20:00
Event End:November 24, 2017 07:00
Last Change: Entered 2017-11-15 13:47

Top of page Top of page


HWY 12 Northbound [ HWY 48 SOUTH JCT - DURHAM ROAD 50 ] - Recurring-Construction
Highway:HWY 12
Direction:Northbound
From/At:HWY 48 SOUTH JCT
To:DURHAM ROAD 50
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 27, 2017 20:00
Event End:December 01, 2017 07:00
Last Change: Entered 2017-11-21 07:27

Top of page Top of page


HWY 140 Northbound [ EAST MAIN STREET/FARR ROAD - EAST MAIN STREET/FARR ROAD ] - Recurring-Construction
Highway:HWY 140
Direction:Northbound
From/At:EAST MAIN STREET/FARR ROAD
To:EAST MAIN STREET/FARR ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-13 16:42

Top of page Top of page


HWY 140 Southbound [ BUCHNER ROAD - BUCHNER ROAD ] - Recurring-Construction
Highway:HWY 140
Direction:Southbound
From/At:BUCHNER ROAD
To:BUCHNER ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :1 through lane maintained by flagging operation.
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 20:00
Last Change: Entered 2017-11-17 09:00

Top of page Top of page


HWY 140 Southbound [ EAST MAIN STREET/FARR ROAD - EAST MAIN STREET/FARR ROAD ] - Recurring-Construction
Highway:HWY 140
Direction:Southbound
From/At:EAST MAIN STREET/FARR ROAD
To:EAST MAIN STREET/FARR ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-13 16:43

Top of page Top of page


HWY 20 (N.FALLS-ELFR) Eastbound [ HWY 58 - NIAGARA 70 ] - Recurring-Construction
Highway:HWY 20 (N.FALLS-ELFR)
Direction:Eastbound
From/At:HWY 58
To:NIAGARA 70
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-16 10:51

Top of page Top of page


HWY 20 (N.FALLS-ELFR) Westbound [ NIAGARA 70 - HWY 58 ] - Recurring-Construction
Highway:HWY 20 (N.FALLS-ELFR)
Direction:Westbound
From/At:NIAGARA 70
To:HWY 58
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-16 10:51

Top of page Top of page


HWY 21 Northbound [ Sararas Road - Stanley Boulevard ] - Recurring-Construction
Highway:HWY 21
Direction:Northbound
From/At:Sararas Road
To:Stanley Boulevard
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 21 Northbound and Southbound from Stanley Boulevard to Sararas Road will have alternating lane closures from November 20th at 0630 hours until November 24th at 1900 hours.
Event Start:November 20, 2017 06:30
Event End:November 24, 2017 19:00
Last Change: Entered 2017-11-17 14:11

Top of page Top of page


HWY 21 Northbound [ Zion Road [ near Amberley ] - Laurier Line (East Side) [ near Amberley ] ] - Construction
Highway:HWY 21
Direction:Northbound
From/At:Zion Road [ near Amberley ]
To:Laurier Line (East Side) [ near Amberley ]
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 21 northbound and southbound from Zion Road to Laurier Line will have alternating lane closures on Wednesday, November 22nd, 2017, from 1200 hours to 1800 hours for construction purposes
Event Start:November 22, 2017 12:00
Event End:November 22, 2017 18:00
Last Change: Entered 2017-11-21 15:14

Top of page Top of page


HWY 23 Southbound [ Line 66 - Line 66 ] - Recurring-Construction
Highway:HWY 23
Direction:Southbound
From/At: Line 66
To: Line 66
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 23 southbound just north of Line 66 will have a left lane closure daily from July 24th to November 24th at 0200 hours to 1700 hours daily due to construction.
Event Start:July 24, 2017 02:00
Event End:November 24, 2017 17:00
Last Change: Entered 2017-07-24 15:09

Top of page Top of page


HWY 24 Southbound [ German School Road - German School Road ] - Construction
Highway:HWY 24
Direction:Southbound
From/At:German School Road
To:German School Road
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 24 southbound at German School Road, will have a right lane closure on Wednesday, November 22nd, 2017, from 0730 hours to 1800 hours for construction purposes
Event Start:November 22, 2017 07:30
Event End:November 22, 2017 18:00
Last Change: Entered 2017-11-21 15:44

Top of page Top of page


HWY 26 Eastbound [ POPLAR SIDEROAD - POPLAR SIDEROAD ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:POPLAR SIDEROAD
To:POPLAR SIDEROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 22, 2017 07:00
Event End:December 08, 2017 16:00
Last Change: Entered 2017-11-17 15:23

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closed 0700-1900. Fri: 1 lane closed 0700-1500. Sat: 1 lane closed 0700-1200.
Event Start:November 20, 2017 07:00
Event End:November 25, 2017 12:00
Last Change: Entered 2017-11-15 08:26

Top of page Top of page


HWY 26 Eastbound [ SUNNIDALE CORNERS - SUNNIDALE CORNERS ] - Recurring-Construction
Highway:HWY 26
Direction:Eastbound
From/At:SUNNIDALE CORNERS
To:SUNNIDALE CORNERS
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mono-Thu: 1 lane closed 0700-1900. Fri: 1 lane closed 0700-1500. Sat: 1 lane closed 0700-1200.
Event Start:November 20, 2017 07:00
Event End:November 25, 2017 12:00
Last Change: Entered 2017-11-15 08:31

Top of page Top of page


HWY 26 Westbound [ POPLAR SIDEROAD - POPLAR SIDEROAD ] - Recurring-Construction
Highway:HWY 26
Direction:Westbound
From/At:POPLAR SIDEROAD
To:POPLAR SIDEROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 22, 2017 07:00
Event End:December 08, 2017 16:00
Last Change: Entered 2017-11-17 15:27

Top of page Top of page


HWY 3 Eastbound [ TOWNLINE ROAD - HWY 140/ELIZABETH STREET ] - Recurring-Construction
Highway:HWY 3
Direction:Eastbound
From/At:TOWNLINE ROAD
To:HWY 140/ELIZABETH STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-13 15:50

Top of page Top of page


HWY 3 Westbound [ HWY 140/ELIZABETH STREET - TOWNLINE ROAD ] - Recurring-Construction
Highway:HWY 3
Direction:Westbound
From/At:HWY 140/ELIZABETH STREET
To:TOWNLINE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 07:30
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-13 15:53

Top of page Top of page


HWY 35/115 Northbound [ 3RD ROAD - WILCOX ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:3RD ROAD
To:WILCOX ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 14:00
Last Change: Entered 2017-11-01 16:28

Top of page Top of page


HWY 35/115 Northbound [ HWY 401 - 3RD ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Northbound
From/At:HWY 401
To:3RD ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-01 16:27

Top of page Top of page


HWY 35/115 Northbound [ MAIN ST. - HWY 35 ] - Recurring-Construction
Highway:HWY 35/115
Direction:Northbound
From/At:MAIN ST.
To:HWY 35
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 22, 2017 08:00
Event End:November 23, 2017 14:00
Last Change: Entered 2017-11-20 12:07

Top of page Top of page


HWY 35/115 Southbound [ 3RD ROAD - HWY 401 ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:3RD ROAD
To:HWY 401
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 17:30
Last Change: Entered 2017-11-14 16:55

Top of page Top of page


HWY 35/115 Southbound [ 3RD ROAD - HWY 401 ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:3RD ROAD
To:HWY 401
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 17:30
Last Change: Entered 2017-11-01 16:35

Top of page Top of page


HWY 35/115 Southbound [ HWY 35 - MAIN ST. ] - Recurring-Construction
Highway:HWY 35/115
Direction:Southbound
From/At:HWY 35
To:MAIN ST.
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 22, 2017 08:00
Event End:November 23, 2017 15:00
Last Change: Entered 2017-11-20 12:09

Top of page Top of page


HWY 35/115 Southbound [ WILCOX ROAD - 3RD ROAD ] - Recurring-Engineering Investigation
Highway:HWY 35/115
Direction:Southbound
From/At:WILCOX ROAD
To:3RD ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 17:30
Last Change: Entered 2017-11-01 16:33

Top of page Top of page


HWY 4 Southbound [ Chestnut Street - Saintsbury Line / County Road 47 ] - Special Event
Highway:HWY 4
Direction:Southbound
From/At:Chestnut Street
To:Saintsbury Line / County Road 47
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonSpecial Event
Comment :Highway 4 northbound and southbound, between Chestnut Street and Saintsbury Line, Lucan, closed to traffic, Saturday, December 2nd, 2017, from 1800 hours until 1930 hours, for Lucan Biddulph Township Santa Claus Parade, traffic control provided by OPP Lucan and Lucan Biddulph Township Public Works Department, with a temporary local detour in effect (Further information: https://www.lucanbiddulph.on.ca/).
Event Start:December 02, 2017 18:00
Event End:December 02, 2017 19:30
Last Change: Entered 2017-11-21 17:46

Top of page Top of page


HWY 400 Northbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 10:00. Thursday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 9:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 10:00.
Event Start:November 27, 2017 20:00
Event End:December 04, 2017 10:00
Last Change: Entered 2017-11-21 07:59

Top of page Top of page


HWY 400 Northbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 10:00. Thursday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 7:00, full reopen at 9:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 10:00.
Event Start:November 20, 2017 20:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-14 08:10

Top of page Top of page


HWY 400 Northbound [ AURORA ROAD. - HWY 9 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:AURORA ROAD.
To:HWY 9
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday- Thursday: 1 lane closed at 19:00 expanding to a 2 lane closure at 20:00. 1 lane reopens at 06:00, all lanes reopen at 11:00. Friday: 1 lane closed at 19:00 expanding to a 2 lane closure at 21:00. 1 lane reopens at 08:00, all lanes reopen at 11:00. Saturday: 1 lane closed at 17:00 expanding to a 2 lane closure at 19:00. 1 lane reopens at 10:00, all lanes reopen at 11:00. Sunday: Two lanes closed at 21:00; 1 lane reopens at 06:00, all lanes reopen at 11:00.
Event Start:November 20, 2017 17:00
Event End:November 27, 2017 11:00
Last Change: Entered 2017-11-14 08:47

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 06:00. Monday -Thursday: 1 lane closure from 00:00 to 23:59, and 2 lane closure from 20:00 to 06:00. Friday: 1 lane closure from 00:00 to 12:00 and 1 lane (of Lane 2) closure from 22:00 to 10:00. Saturday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 22:00 to 10:00.
Event Start:November 26, 2017 00:00
Event End:December 02, 2017 23:59
Last Change: Entered 2017-11-21 12:22

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:December 01, 2017 20:00
Event End:December 01, 2017 23:59
Last Change: Entered 2017-11-21 12:25

Top of page Top of page


HWY 400 Northbound [ DUCKWORTH STREET - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:DUCKWORTH STREET
To:HWY 11 JCT
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 06:00. Monday to Wednesday: 1 lane closure from 00:00 to 23:59, and 2 lane closure from 20:00 to 06:00. Thursday: 1 lane closure from 00:00 to 12:00, 2 lane closure at 20:00 to 06:00. Friday: 1 lane closure from 20:00 to 23:59 and 2 lane closure from 22:00 to 10:00. Saturday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 22:00 to 10:00.
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:26

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - MAPLEVIEW DRIVE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:MAPLEVIEW DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:00, 2 lane closure at 21:00. Full reopen at 7:00. Friday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 9:00. Saturday: 1 lane closure at 19:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 19:00, 2 lane closure at 22:00. Full reopen at 7:00.
Event Start:November 20, 2017 19:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-08 07:40

Top of page Top of page


HWY 400 Northbound [ INNISFIL BEACH ROAD - SIMCOE ROAD 21 - MAPLEVIEW DRIVE ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:INNISFIL BEACH ROAD - SIMCOE ROAD 21
To:MAPLEVIEW DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 20:00, 2 lane closure at 21:00. Full reopen at 7:00. Friday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 9:00. Saturday: 1 lane closure at 19:00, 2 lane closure at 22:00. 1 lane reopen at 8:00, full reopen at 10:00. Sunday: 1 lane closure at 19:00, 2 lane closure at 22:00. Full reopen at 7:00.
Event Start:November 27, 2017 19:00
Event End:December 04, 2017 10:00
Last Change: Entered 2017-11-21 08:22

Top of page Top of page


HWY 400 Northbound [ KING ROAD - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:KING ROAD
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday: 1 lane closure at 20:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 11:00. Tuesday-Wednesday: 1 lane closure at 21:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 11:00. Thursday: 1 lane closure at 21:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 10:00. Friday: 1 lane closure at 21:00, 2 lane closure at 23:59. 1 lane reopen at 7:00, full reopen at 10:00. Saturday: 1 lane closure at 19:00, 2 lane closure at 23:00. 1 lane reopen at 9:00, full reopen at 11:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 22:00. 1 lane reopen at 6:00, full reopen at 11:00.
Event Start:November 20, 2017 21:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-16 15:36

Top of page Top of page


HWY 400 Northbound [ MAPLEVIEW DRIVE - DUCKWORTH STREET ] - Recurring-Maintenance
Highway:HWY 400
Direction:Northbound
From/At:MAPLEVIEW DRIVE
To:DUCKWORTH STREET
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 11:09

Top of page Top of page


HWY 400 Northbound [ PORT SEVERN ROAD - SEVERN RIVER BRIDGE ] - Construction
Highway:HWY 400
Direction:Northbound
From/At:PORT SEVERN ROAD
To:SEVERN RIVER BRIDGE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 22, 2017 07:00
Event End:November 23, 2017 17:00
Last Change: Entered 2017-11-17 12:43

Top of page Top of page


HWY 400 Northbound [ SHEPPARD AVENUE - FINCH AVENUE ] - Recurring-Maintenance
Highway:HWY 400
Direction:Northbound
From/At:SHEPPARD AVENUE
To:FINCH AVENUE
Lanes Affected:4 Alternating Lane(s)
Traffic Impact :Off-ramp to FINCH AVENUE EB/WB
ReasonRecurring-Maintenance
Comment :
Event Start:November 21, 2017 23:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-17 11:03

Top of page Top of page


HWY 400 Northbound [ SIMCOE ROAD 88 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:SIMCOE ROAD 88
To:HWY 89/SIMCOE ROAD 89
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 2 lane closure at 20:00. 1 lane reopen at 7:00, full reopen at 11:00. Thursday: 2 lane closure at 20:00. 1 lane reopen at 6:00, full reopen at 8:00. Friday: 2 lane closure at 22:00. 1 lane reopen at 8:00, the other lane remains closed. Saturday: 2 lane closure at 21:00. 1 lane reopen at 10:00, the other lane remains closed. Sunday: 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 11:00.
Event Start:November 27, 2017 20:00
Event End:December 04, 2017 11:00
Last Change: Entered 2017-11-21 08:14

Top of page Top of page


HWY 400 Northbound [ SIMCOE ROAD 88 - HWY 89/SIMCOE ROAD 89 ] - Recurring-Construction
Highway:HWY 400
Direction:Northbound
From/At:SIMCOE ROAD 88
To:HWY 89/SIMCOE ROAD 89
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Wednesday: 2 lane closure at 20:00. 1 lane reopen at 7:00, full reopen at 11:00. Thursday: 2 lane closure at 20:00. 1 lane reopen at 6:00, full reopen at 8:00. Friday: 2 lane closure at 22:00. 1 lane reopen at 8:00, the other lane remains closed. Saturday: 2 lane closure at 21:00. 1 lane reopen at 10:00, the other lane remains closed. Sunday: 2 lane closure at 21:00. 1 lane reopen at 7:00, full reopen at 11:00.
Event Start:November 20, 2017 20:00
Event End:November 27, 2017 11:00
Last Change: Entered 2017-11-14 08:24

Top of page Top of page


HWY 400 Southbound [ 401 - 401 ] - Construction
Highway:HWY 400
Direction:Southbound
From/At:401
To:401
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Tuesday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:November 21, 2017 21:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-20 10:58

Top of page Top of page


HWY 400 Southbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 18:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 8:00, full reopen at 10:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:November 27, 2017 18:00
Event End:December 04, 2017 10:00
Last Change: Entered 2017-11-21 08:07

Top of page Top of page


HWY 400 Southbound [ 4TH LINE - 4TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:4TH LINE
To:4TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 18:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 8:00, full reopen at 10:00. Saturday: 1 lane closure at 20:00, 2 lane closure at 21:00. 1 lane reopen at 9:00, full reopen at 10:00. Sunday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:November 20, 2017 18:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-14 08:13

Top of page Top of page


HWY 400 Southbound [ AURORA ROAD. - KING ROAD ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:AURORA ROAD.
To:KING ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 19:00, 2 lane closure at 22:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 10:00. Saturday: 1 lane closure at 23:00, 2 lane closure at 23:59. 1 lane reopen at 9:00, full reopen at 11:00. Sunday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 20, 2017 19:00
Event End:November 27, 2017 05:00
Last Change: Entered 2017-11-16 15:59

Top of page Top of page


HWY 400 Southbound [ CANAL ROAD. - AURORA ROAD. ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:CANAL ROAD.
To:AURORA ROAD.
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 9 EB/WB, Off-ramp to HWY 9 EB/WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 8:00, full reopen at 11:00. Saturday: 1 lane closure at 18:00, 2 lane closure at 20:00. 1 lane reopen at 9:00, full reopen at 11:00. Sunday: 1 lane closure at 20:00, 2 lane closure at 22:00. Full reopen at 5:00.
Event Start:November 20, 2017 11:00
Event End:November 27, 2017 11:00
Last Change: Entered 2017-11-14 08:52

Top of page Top of page


HWY 400 Southbound [ DUCKWORTH STREET - MAPLEVIEW DRIVE ] - Recurring-Maintenance
Highway:HWY 400
Direction:Southbound
From/At:DUCKWORTH STREET
To:MAPLEVIEW DRIVE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 11:10

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 Lane closure from 00:00 to 23:59 and 2 lane closure from 22:00 to 06:00. Monday to Thursday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 6:00. Friday: 1 Lane closure from 00:00 to 23:59 and 2 lane closure from 22:00 to 09:00. Saturday: 1 lane closure from 00:00 to 11:00 and 2 lane closure from 20:00 to 09:00.
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:34

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 Lane closure from 00:00 to 11:00 and 1 lane closure (of Lane 2) from 22:00 to 06:00. Monday-Friday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 6:00. Saturday: 1 lane closure from 00:00 to 23:59 and 2 lane closure from 20:00 to 09:00.
Event Start:November 26, 2017 00:00
Event End:December 02, 2017 23:59
Last Change: Entered 2017-11-21 12:33

Top of page Top of page


HWY 400 Southbound [ HWY 11 JCT - DUCKWORTH STREET ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 11 JCT
To:DUCKWORTH STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 26, 2017 21:00
Event End:November 26, 2017 23:59
Last Change: Entered 2017-11-21 12:36

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 89/SIMCOE ROAD 89
To:SIMCOE ROAD 88
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 7:00, the other lane remains closed. Friday: 2 lane closure at 19:00. Full reopen at 10:00. Sunday: 2 lane closure at 21:00. Full reopen at 5:00.
Event Start:November 20, 2017 11:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-14 08:32

Top of page Top of page


HWY 400 Southbound [ HWY 89/SIMCOE ROAD 89 - SIMCOE ROAD 88 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:HWY 89/SIMCOE ROAD 89
To:SIMCOE ROAD 88
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closure at 11:00, 2 lane closure at 19:00. Full reopen at 5:00. Friday: 2 lane closure at 19:00. 1 lane reopen at 7:00, the other lane remains closed. Friday: 2 lane closure at 19:00. Full reopen at 10:00. Sunday: 1 lane closure at 21:00, 2 lane closure at 23:00 Full reopen at 5:00.
Event Start:November 27, 2017 11:00
Event End:December 04, 2017 10:00
Last Change: Entered 2017-11-21 08:18

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:MAPLEVIEW DRIVE
To:INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday; 1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0500, 2nd lane opens at 0600. Friday;1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0800, 2nd lane opens at 0900. Saturday;1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0800, 2nd lane opens at 1000. Sunday;1 lane closes at 2000, 2nd land closes at 2200. 1 lane opens at 0500, 2nd lane opens at 0600.
Event Start:November 20, 2017 19:00
Event End:November 27, 2017 10:00
Last Change: Entered 2017-11-08 07:43

Top of page Top of page


HWY 400 Southbound [ MAPLEVIEW DRIVE - INNISFIL BEACH ROAD - SIMCOE ROAD 21 ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:MAPLEVIEW DRIVE
To:INNISFIL BEACH ROAD - SIMCOE ROAD 21
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday; 1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0500, 2nd lane opens at 0600. Friday; 1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0800, 2nd lane opens at 0900. Saturday; 1 lane closes at 1900, 2nd land closes at 2100. 1 lane opens at 0800, 2nd lane opens at 1000. Sunday; 1 lane closes at 2000, 2nd land closes at 2200. 1 lane opens at 0500, 2nd lane opens at 0600.
Event Start:November 27, 2017 19:00
Event End:December 04, 2017 10:00
Last Change: Entered 2017-11-21 08:30

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:PARTRIDGE SKI TRAIL ROAD
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday to Saturday: 1 lane closure from 00:00 to 23:59
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-15 15:31

Top of page Top of page


HWY 400 Southbound [ PARTRIDGE SKI TRAIL ROAD - HWY 11 JCT ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:PARTRIDGE SKI TRAIL ROAD
To:HWY 11 JCT
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 26, 2017 00:00
Event End:December 02, 2017 23:59
Last Change: Entered 2017-11-21 12:28

Top of page Top of page


HWY 400 Southbound [ SEVERN RIVER BRIDGE - PORT SEVERN ROAD ] - Construction
Highway:HWY 400
Direction:Southbound
From/At:SEVERN RIVER BRIDGE
To:PORT SEVERN ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 22, 2017 07:00
Event End:November 23, 2017 17:00
Last Change: Entered 2017-11-17 12:46

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:SIMCOE ROAD 88
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closed at 20:00 expanding to a 2 lane closure at 22:00. Full reopen at 05:00. Monday-Thursday: 1 lane closed at 11:00 expanding to a 2 lane closure at 19:00. Full reopen at 05:00. Friday: 1 lane closed at 18:00 expanding to a 2 lane closure at 20:00. 1 lane reopens at 08:00 and full reopen at 10:00
Event Start:November 19, 2017 11:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-08 17:08

Top of page Top of page


HWY 400 Southbound [ SIMCOE ROAD 88 - 5TH LINE ] - Recurring-Construction
Highway:HWY 400
Direction:Southbound
From/At:SIMCOE ROAD 88
To:5TH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closed at 20:00 expanding to a 2 lane closure at 22:00. Full reopen at 05:00. Monday-Thursday: 1 lane closed at 11:00 expanding to a 2 lane closure at 19:00. Full reopen at 05:00. Friday: 1 lane closed at 18:00 expanding to a 2 lane closure at 20:00. 1 lane reopens at 08:00 and full reopen at 10:00
Event Start:November 26, 2017 20:00
Event End:December 02, 2017 05:00
Last Change: Entered 2017-11-16 10:30

Top of page Top of page


HWY 400 Southbound [ STEELES AVENUE - FINCH AVENUE ] - Recurring-Maintenance
Highway:HWY 400
Direction:Southbound
From/At:STEELES AVENUE
To:FINCH AVENUE
Lanes Affected:4 Alternating Lane(s)
Traffic Impact :Off-ramp to FINCH AVENUE EB/WB
ReasonRecurring-Maintenance
Comment :
Event Start:November 21, 2017 23:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-17 11:00

Top of page Top of page


HWY 400 Southbound Collector Off-ramp [ - HIGHWAY 7 Eastbound/Westbound ] - Construction
Highway:HWY 400
Direction:Southbound
From/At:
To:HIGHWAY 7 Eastbound/Westbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 22, 2017 20:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-14 10:45

Top of page Top of page


HWY 400 Southbound Collector [ LANGSTAFF ROAD Collector - HIGHWAY 7 Collector ] - Construction
Highway:HWY 400
Direction:Southbound
From/At:LANGSTAFF ROAD Collector
To:HIGHWAY 7 Collector
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 22, 2017 20:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-20 16:01

Top of page Top of page


HWY 400 Southbound On-ramp [ HIGHWAY 7 Westbound - ] - Construction
Highway:HWY 400
Direction:Southbound
From/At:HIGHWAY 7 Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 22, 2017 23:59
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-17 16:58

Top of page Top of page


HWY 401 Eastbound [ CAMDEN EAST RD (IC 593) - CAMDEN EAST RD (IC 593) ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:CAMDEN EAST RD (IC 593)
To:CAMDEN EAST RD (IC 593)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Lane reductions Hwy 401 EB @ Camden East Rd (Odessa)
Event Start:November 20, 2017 07:00
Event End:November 22, 2017 16:00
Last Change: Entered 2017-11-10 16:32

Top of page Top of page


HWY 401 Eastbound [ COURTICE ROAD - HOLT ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD
To:HOLT ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Expanding closure: Friday: 2 lanes closed at 22:00. 1 lane reopens at 07:00, full reopen at 09:00. Saturday: 1 lane closed at 18:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 07:00, full reopen at 10:00. Sunday: 1 lane closed at 22:00 expanding to a 2 lane closure at 23:00. 1 lane reopens at 05:00, full reopen at 06:00. Monday to Wednesday: 1 lane closed at 18:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 05:00, full reopen at 06:00
Event Start:November 17, 2017 18:00
Event End:November 23, 2017 06:00
Last Change: Entered 2017-11-17 15:24

Top of page Top of page


HWY 401 Eastbound [ COURTICE ROAD - HOLT ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD
To:HOLT ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 12:00
Last Change: Entered 2017-11-17 16:16

Top of page Top of page


HWY 401 Eastbound [ FRASER RD - FRASER RD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:FRASER RD
To:FRASER RD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Right lane closed Hwy 401 E/B east of Fraser Rd (Summerstown)
Event Start:November 23, 2017 07:00
Event End:November 24, 2017 19:00
Last Change: Entered 2017-11-16 14:25

Top of page Top of page


HWY 401 Eastbound [ GUELPH LINE - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:GUELPH LINE
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, all lanes reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 06:08

Top of page Top of page


HWY 401 Eastbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, full reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 06:14

Top of page Top of page


HWY 401 Eastbound [ HWY 412 - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 412
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 06:00, fully open at 07:00. Fri; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 07:00, fully open at 08:00. Sat; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 08:00, fully open at 10:00. Sun; one lane closed at 20:30, two lanes closed at 22:00. One lane open at 06:00, fully open at 07:00
Event Start:November 27, 2017 20:30
Event End:December 04, 2017 07:00
Last Change: Entered 2017-11-14 16:01

Top of page Top of page


HWY 401 Eastbound [ HWY 412 - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 412
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 06:00, fully open at 07:00. Fri; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 07:00, fully open at 08:00. Sat; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 08:00, fully open at 10:00. Sun; one lane closed at 20:30, two lanes closed at 22:30. One lane open at 06:00, fully open at 07:00
Event Start:November 20, 2017 20:30
Event End:November 27, 2017 07:00
Last Change: Entered 2017-11-14 15:41

Top of page Top of page


HWY 401 Eastbound [ Highway 8 / King Street E/Shantz Hill Rd (278KM) - Franklin Blvd (284KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Highway 8 / King Street E/Shantz Hill Rd (278KM)
To:Franklin Blvd (284KM)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from Highway 24 / Hespeler Rd (282KM) WB, On-ramp from Highway 8 / King Street E/Shantz Hill Rd (278KM) EB, On-ramp from Highway 24 / Hespeler Rd (282KM) WB
ReasonRecurring-Construction
Comment :Highway 401 will have lane closures in both eastbound and westbound directions from King Street (highway 8) to Franklin Boulevard (Highway 36). Eastbound will close the right lane on November 20th from 20:00 hours to 06:00 hours and the left lane on November 21, 22 and 23 from 20:00 hours to 06:00 hours. Westbound will close the right lane on November 20 and 21 from 20:00 hours to 06:00 hours and the left lane on November 22 and 23 from 20:00 hours to 06:00 hours. The Northbound Hespeler Road on-ramp to the 401 westbound will be closed on November 20, 21 and 22 from 19:00 hours to 07:00 hours. The Shantz Hill North/Southbound on-ramp to the 401 Eastbound will be closed November 21, 22 and 23 from 21:00 hours to 06:00 hours. The Southbound Hespeler Road on-ramp to the 401 westbound will be closed November 20, 21, 22 and 23 from 23:00 hours to 06:00 hours.
Event Start:November 20, 2017 19:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-18 00:50

Top of page Top of page


HWY 401 Eastbound [ JAMES SNOW PKWY - FIFTH LINE ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JAMES SNOW PKWY
To:FIFTH LINE ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from JAMES SNOW PKWY NB
ReasonRecurring-Construction
Comment :Tue-Fri: Single lane closed at 22:00, and expanding to a two lane closure at 23:59/ Alternating 2 out of 3; all lanes opened at 5:00.
Event Start:November 21, 2017 22:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-17 10:06

Top of page Top of page


HWY 401 Eastbound [ JAMES SNOW PKWY - TRAFALGAR ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JAMES SNOW PKWY
To:TRAFALGAR ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. All lanes reopen at 05:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 06:00, full reopen at 08:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 06:12

Top of page Top of page


HWY 401 Eastbound [ JOHN F. SCOTT RD - MALLORYTOWN RD (IC 675) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JOHN F. SCOTT RD
To:MALLORYTOWN RD (IC 675)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Intermittent right lane closures Hwy 401 E/B or W/B btwn KM 627 and KM 675 (Kingston to Mallorytown)
Event Start:November 22, 2017 07:00
Event End:November 29, 2017 17:30
Last Change: Entered 2017-11-20 14:01

Top of page Top of page


HWY 401 Eastbound [ Mill Street (56KM) - Bloomfield Road (81KM) ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:Mill Street (56KM)
To:Bloomfield Road (81KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 401 Eastbound and Westbound from Essex Road 42 to Bloomfield Road will have left lane closures from November 1st at 2200 hours until further notice
Event Start:November 01, 2017 22:00
Event End:December 01, 2017 07:00
Last Change: Entered 2017-11-01 12:13

Top of page Top of page


HWY 401 Eastbound [ NASSAGWAEGA ROAD - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:NASSAGWAEGA ROAD
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, all lanes reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 06:09

Top of page Top of page


HWY 401 Eastbound [ Puslinch Rd 7 / MacLean Rd W - Highway 6 South / Queen Street / Brock Road (299KM) ] - Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:Puslinch Rd 7 / MacLean Rd W
To:Highway 6 South / Queen Street / Brock Road (299KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonEngineering Investigation
Comment :Highway 401 eastbound, from Puslinch Road 7 (MacLean Road West) Kilometre Marker 297 to Highway 6 south (Wellington Road 46 / Brock Road) Interchange 299, Guelph / Morriston, reduced from 3 lanes to 2 lanes of traffic, Tuesday, November 21st, 2017 at 1900 hour until Wednesday, November 22nd, 2017 at 0700 hours, for construction work operations, weather permitting.
Event Start:November 21, 2017 19:00
Event End:November 22, 2017 07:00
Last Change: Entered 2017-11-20 20:11

Top of page Top of page


HWY 401 Eastbound [ RENFORTH DRIVE - HWY 427 ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:RENFORTH DRIVE
To:HWY 427
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :Off-ramp to EGLINTON AVE EB
ReasonRecurring-Construction
Comment :Monday-Thursday: 2 lane closure at 22:00, 3 lane closure at 23:59. 2 lane reopen at 5:00, full reopen at 6:00.
Event Start:November 20, 2017 22:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-20 06:30

Top of page Top of page


HWY 401 Eastbound [ TRAFALGAR ROAD - 407ETR ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TRAFALGAR ROAD
To:407ETR
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Tuesday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 21, 2017 22:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-17 10:08

Top of page Top of page


HWY 401 Eastbound [ Tilbury South OnRoute/Eastbound service centre (61 km) - Tilbury South OnRoute/Eastbound service centre (61 km) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Tilbury South OnRoute/Eastbound service centre (61 km)
To:Tilbury South OnRoute/Eastbound service centre (61 km)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 from Essex Rd. 42 to Victoria Rd. will have the left lane closed in alternating directions 11/20 to 11/23 from 0730-1800 hours, 11/24 0730 hours to 1230 hours, 11/27 to 11/30 from 0730-1800 hours and 12/1 from 0730 to 1230 hours.
Event Start:November 20, 2017 00:00
Event End:December 01, 2017 12:30
Last Change: Entered 2017-11-16 11:25

Top of page Top of page


HWY 401 Eastbound [ Veterans Memorial Parkway (194KM) - Veterans Memorial Parkway (194KM) ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:Veterans Memorial Parkway (194KM)
To:Veterans Memorial Parkway (194KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 401 at Veterans Memorial Parkway will have lane 3 closures (right lane) in both directions May 17 for approx 6 months
Event Start:May 17, 2017 00:00
Event End:December 17, 2017 00:00
Last Change: Entered 2017-05-17 08:42

Top of page Top of page


HWY 401 Eastbound [ Victoria Road / Kent Road 17 (109KM) - Currie Rd (149KM) ] - Special Event
Highway:HWY 401
Direction:Eastbound
From/At:Victoria Road / Kent Road 17 (109KM)
To:Currie Rd (149KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonSpecial Event
Comment :Highway 401 Eastbound and Westbound from Victoria Road to Currie Road will have left lane closures from November 13th at 0700 hours until November 24th at 1700 hours.
Event Start:November 13, 2017 07:00
Event End:November 24, 2017 17:00
Last Change: Entered 2017-11-07 13:58

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - JANE ST Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Collector
To:JANE ST Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 400/BLACK CREEK DRIVE SB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 5:00, full reopen at 5:30.
Event Start:November 19, 2017 22:00
Event End:November 24, 2017 05:30
Last Change: Entered 2017-11-16 06:31

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 400/BLACK CREEK DRIVE Collector - JANE ST Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Collector
To:JANE ST Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 400/BLACK CREEK DRIVE SB
ReasonRecurring-Construction
Comment :Friday-Saturday: 1 lane closure at 23:00, 2 lane closure at 23:59. 1 lane reopen at 7:00, full reopen at 8:00.
Event Start:November 24, 2017 23:00
Event End:November 26, 2017 08:00
Last Change: Entered 2017-11-16 06:35

Top of page Top of page


HWY 401 Eastbound Collector [ HWY 404 Collector - HWY 404 Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 404 Collector
To:HWY 404 Collector
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-14 13:58

Top of page Top of page


HWY 401 Eastbound Collector [ ISLINGTON AVE Collector - WESTON ROAD Collector ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:ISLINGTON AVE Collector
To:WESTON ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from ISLINGTON AVE SB, Off-ramp to WESTON ROAD NB/SB
ReasonConstruction
Comment :
Event Start:November 21, 2017 22:00
Event End:November 22, 2017 06:00
Last Change: Entered 2017-11-19 18:12

Top of page Top of page


HWY 401 Eastbound Collector [ JANE ST Collector - KEELE ST Collector ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:JANE ST Collector
To:KEELE ST Collector
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 21, 2017 22:00
Event End:November 22, 2017 05:30
Last Change: Entered 2017-11-20 11:04

Top of page Top of page


HWY 401 Eastbound Collector [ JANE ST Collector - KEELE ST Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JANE ST Collector
To:KEELE ST Collector
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Friday: 1 lane closure at 23:00, 2 lane closure at 23:59. 1 lane reopen at 7:00, full reopen at 8:00. Saturday: 1 lane closure at 23:00, 2 lane closure at 23:59. 1 lane reopen at 7:00, full reopen at 9:00.
Event Start:November 24, 2017 23:00
Event End:November 26, 2017 08:00
Last Change: Entered 2017-11-16 06:38

Top of page Top of page


HWY 401 Eastbound Collector [ JANE ST Collector - KEELE ST Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:JANE ST Collector
To:KEELE ST Collector
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 22:00, 2 lane closure at 23:59. Full reopen at 05:00. Monday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00.
Event Start:November 19, 2017 22:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-16 06:33

Top of page Top of page


HWY 401 Eastbound Collector [ KIPLING AVE Collector - WESTON ROAD Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:KIPLING AVE Collector
To:WESTON ROAD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from ISLINGTON AVE NB/SB, Off-ramp to WESTON ROAD NB/SB, On-ramp from HWY 409 SB
ReasonRecurring-Construction
Comment :Wednesday: 1 lane closure at 22:00, 2 lane closure at 23:59. 1 lane reopen at 5:00, full reopen at 5:30. 409 SB off-ramp to 401 EB collectors closed midnight to 5:30. Access available to 401 EB via the express.
Event Start:November 22, 2017 22:00
Event End:November 23, 2017 05:30
Last Change: Entered 2017-11-16 22:25

Top of page Top of page


HWY 401 Eastbound Collector [ LESLIE STREET Collector - HWY 404 Collector ] - Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:LESLIE STREET Collector
To:HWY 404 Collector
Lanes Affected:ALL LANES CLOSED
Traffic Impact :Off-ramp to HWY 404 SB
ReasonMaintenance
Comment :
Event Start:November 21, 2017 23:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-17 10:50

Top of page Top of page


HWY 401 Eastbound Collector [ NEILSON ROAD Collector - WHITES ROAD Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:NEILSON ROAD Collector
To:WHITES ROAD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 21, 2017 22:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-20 08:04

Top of page Top of page


HWY 401 Eastbound Collector [ TOMKEN ROAD Collector - RENFORTH DRIVE Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Collector
To:RENFORTH DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closes at 2200, expanding to 2 lanes at 2300. Full reopen at 0500. Fri: 1 lane closes at 2200, expanding to 2 lanes at 2300. 1 lane reopens at 0700, full reopen at 0800.
Event Start:November 20, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 17:40

Top of page Top of page


HWY 401 Eastbound Express Off-ramp [ - RITSON ROAD Eastbound ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:RITSON ROAD Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 23, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-21 14:45

Top of page Top of page


HWY 401 Eastbound Express [ KIPLING AVE Express - KIPLING AVE Collector ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:KIPLING AVE Express
To:KIPLING AVE Collector
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-20 09:45

Top of page Top of page


HWY 401 Eastbound Express [ ROUGE RIVER Express - WHITES ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:ROUGE RIVER Express
To:WHITES ROAD Express
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 22:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-16 16:52

Top of page Top of page


HWY 401 Eastbound Express [ TOMKEN ROAD Express - RENFORTH DRIVE Express ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:TOMKEN ROAD Express
To:RENFORTH DRIVE Express
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closes at 2100, expanding to 2 lanes at 2200, expanding to 3 lanes at 2359. Full reopen at 0500. Fri: 1 lane closes at 2100, expanding to 2 lanes at 2200, expanding to 3 lanes at 2359. 1 lane reopens at 0600, 2 lanes reopen at 0700, full reopen at 0800.
Event Start:November 20, 2017 21:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 17:44

Top of page Top of page


HWY 401 Eastbound Express and Collector Off-ramp [ - BROCK ROAD Eastbound ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:BROCK ROAD Eastbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 23, 2017 09:00
Event End:November 23, 2017 12:00
Last Change: Entered 2017-11-20 10:38

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - SIMCOE ST Eastbound ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:
To:SIMCOE ST Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:August 14, 2017 07:00
Event End:December 15, 2017 12:00
Last Change: Entered 2017-08-02 11:57

Top of page Top of page


HWY 401 Eastbound Off-ramp [ - WESTNEY ROAD Eastbound ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:
To:WESTNEY ROAD Eastbound
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 22, 2017 09:00
Event End:November 24, 2017 14:00
Last Change: Entered 2017-11-20 14:47

Top of page Top of page


HWY 401 Eastbound On-ramp [ BROCK ROAD Eastbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:BROCK ROAD Eastbound
To:
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 28, 2017 00:00
Event End:November 28, 2017 05:00
Last Change: Entered 2017-11-17 15:05

Top of page Top of page


HWY 401 Eastbound On-ramp [ COURTICE ROAD Northbound/Southbound - ] - Construction
Highway:HWY 401
Direction:Eastbound
From/At:COURTICE ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:June 05, 2017 23:00
Event End:December 05, 2018 05:00
Last Change: Entered 2017-05-30 15:24

Top of page Top of page


HWY 401 Eastbound On-ramp [ HWY 2/KINGSTON ROAD Northbound/Southbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 2/KINGSTON ROAD Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 23, 2017 23:59
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-19 12:28

Top of page Top of page


HWY 401 Eastbound On-ramp [ HWY 400/BLACK CREEK DRIVE Northbound/Southbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:HWY 400/BLACK CREEK DRIVE Northbound/Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :HWY400 off-ramp to HWY401 EB collectors closed Friday-Sunday 23:59-07:00
Event Start:November 24, 2017 23:59
Event End:November 25, 2017 07:00
Last Change: Entered 2017-11-21 12:59

Top of page Top of page


HWY 401 Eastbound On-ramp [ VICTORIA PARK AVE Northbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:VICTORIA PARK AVE Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 23:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-15 14:28

Top of page Top of page


HWY 401 Eastbound On-ramp [ VICTORIA PARK AVE Southbound - ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:VICTORIA PARK AVE Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-14 15:27

Top of page Top of page


HWY 401 Eastbound Transfer [ MCCOWAN ROAD Express to Collector - ] - Recurring-Maintenance
Highway:HWY 401
Direction:Eastbound
From/At:MCCOWAN ROAD Express to Collector
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-14 15:26

Top of page Top of page


HWY 401 Eastbound Transfer [ MORNINGSIDE AVE Collector to Express - ] - Engineering Investigation
Highway:HWY 401
Direction:Eastbound
From/At:MORNINGSIDE AVE Collector to Express
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonEngineering Investigation
Comment :
Event Start:November 21, 2017 23:59
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-21 09:47

Top of page Top of page


HWY 401 Eastbound Transfer [ WHITES ROAD Express to Collector - ] - Recurring-Construction
Highway:HWY 401
Direction:Eastbound
From/At:WHITES ROAD Express to Collector
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 23:59
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-16 17:01

Top of page Top of page


HWY 401 Westbound [ DIXON ROAD/MARTIN GROVE ROAD - HWY 427 ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:DIXON ROAD/MARTIN GROVE ROAD
To:HWY 427
Lanes Affected:3 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 2 lanes close at 2200, expanding to 3 lanes at 2359. 2 lanes reopen at 0500, full reopen at 0600. Fri: 2 lanes close at 2200, expanding to 3 lanes at 0100. 1 lane reopens at 0600, 2 lanes reopen at 0700, full reopen at 0800.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:49

Top of page Top of page


HWY 401 Westbound [ FRASER RD - SUMMERSTOWN RD (IC 804) ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:FRASER RD
To:SUMMERSTOWN RD (IC 804)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Right lane closed Hwy 401 W/B btwn Fraser Rd and Summerstown Rd (Summerstown)
Event Start:November 20, 2017 06:00
Event End:November 22, 2017 18:00
Last Change: Entered 2017-11-16 14:29

Top of page Top of page


HWY 401 Westbound [ GUELPH LINE - HWY 6 SOUTH ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:GUELPH LINE
To:HWY 6 SOUTH
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopens at 6:00, full reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:10

Top of page Top of page


HWY 401 Westbound [ HOLT ROAD - COURTICE ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HOLT ROAD
To:COURTICE ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 10:00
Event End:November 24, 2017 14:00
Last Change: Entered 2017-11-17 16:18

Top of page Top of page


HWY 401 Westbound [ HOLT ROAD - COURTICE ROAD ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HOLT ROAD
To:COURTICE ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Tue-Fri: Single lane closed at 1800, and expanding to a two lane closure at 2200 / Alternating 2 out of 3; one lane opened at 0500, and all lanes opened at 0600.
Event Start:November 21, 2017 18:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-20 17:02

Top of page Top of page


HWY 401 Westbound [ HWY 25 - GUELPH LINE ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:GUELPH LINE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 6:00. Friday: 1 lane closure at 22:00, 2 lane closure at 23:00. 1 lane reopen at 6:00, full reopen at 8:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:07

Top of page Top of page


HWY 401 Westbound [ HWY 25 - HWY 25 ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:HWY 25
To:HWY 25
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from HWY 25 NB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. All lanes reopened at 06:00. Friday: 1 lane closed at 22:00, 2 lanes closed at 23:00. 1 lane reopened at 06:00. All lanes reopened at 08:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:15

Top of page Top of page


HWY 401 Westbound [ Kent Bridge Rd / Kent Road 15 (101KM) - Bloomfield Road (81KM) ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:Kent Bridge Rd / Kent Road 15 (101KM)
To:Bloomfield Road (81KM)
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Highway 401 eastbound and westbound from Kent Bridge Road to Bloomfield Road on April 30th starting at 1000 hours to November 24th at 1000 hours will have a right lane closure due to road maintenance.
Event Start:April 30, 2017 10:00
Event End:November 24, 2017 10:00
Last Change: Entered 2017-04-24 13:10

Top of page Top of page


HWY 401 Westbound [ SIXTH LINE ROAD - JAMES SNOW PKWY ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:SIXTH LINE ROAD
To:JAMES SNOW PKWY
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lanes closure at 23:00. All lanes reopen at 06:00. Friday: 1 lane closure at 22:00, 2 lanes closure at 23:00. 1 lane reopens at 06:00. All lanes reopen at 08:00.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 06:13

Top of page Top of page


HWY 401 Westbound [ THICKSON ROAD - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:THICKSON ROAD
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from BROCK ST SB
ReasonRecurring-Construction
Comment :Mon-Thu; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30. Fri; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 06:00, fully open at 07:00. Sat; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 08:00, fully open at 09:00. Sun; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30
Event Start:November 20, 2017 20:00
Event End:November 27, 2017 23:00
Last Change: Entered 2017-11-14 15:46

Top of page Top of page


HWY 401 Westbound [ THICKSON ROAD - HENRY ST ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:THICKSON ROAD
To:HENRY ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from BROCK ST SB
ReasonRecurring-Construction
Comment :Mon-Thu; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30. Fri; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 06:00, fully open at 07:00. Sat; one lane closed at 20:00, two lanes closed at 23:00. One lane open at 08:00, fully open at 09:00. Sun; one lane closed at 21:00, two lanes closed at 23:00. One lane open at 05:00, fully open at 05:30
Event Start:November 27, 2017 20:00
Event End:December 04, 2017 05:30
Last Change: Entered 2017-11-14 16:11

Top of page Top of page


HWY 401 Westbound Collector [ HWY 404 Collector - HWY 404 Collector ] - Recurring-Maintenance
Highway:HWY 401
Direction:Westbound
From/At:HWY 404 Collector
To:HWY 404 Collector
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 21, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-14 13:57

Top of page Top of page


HWY 401 Westbound Express [ RENFORTH DRIVE Express - DIXIE ROAD Express ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:RENFORTH DRIVE Express
To:DIXIE ROAD Express
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Mon-Thu: 1 lane closes at 2100, expanding to 2 lanes at 2300. Full reopen at 0500. Fri: 1 lane closes at 2100, expanding to 2 lanes at 2300. 1 lane reopens at 0600, full reopen at 0700.
Event Start:November 20, 2017 21:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 17:18

Top of page Top of page


HWY 401 Westbound Express [ VICTORIA PARK AVE Express - VICTORIA PARK AVE Express ] - Maintenance
Highway:HWY 401
Direction:Westbound
From/At:VICTORIA PARK AVE Express
To:VICTORIA PARK AVE Express
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:November 23, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-21 07:07

Top of page Top of page


HWY 401 Westbound Express and Collector Off-ramp [ - HWY 404 Southbound ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:
To:HWY 404 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 22, 2017 23:59
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-21 08:08

Top of page Top of page


HWY 401 Westbound On-ramp [ BROCK ROAD Northbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:BROCK ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 23, 2017 23:59
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-19 12:17

Top of page Top of page


HWY 401 Westbound On-ramp [ HWY 2/KINGSTON ROAD Eastbound/Westbound - ] - Maintenance
Highway:HWY 401
Direction:Westbound
From/At:HWY 2/KINGSTON ROAD Eastbound/Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:November 24, 2017 02:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-20 13:40

Top of page Top of page


HWY 401 Westbound On-ramp [ WHITES ROAD Northbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:WHITES ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 23, 2017 23:59
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-19 12:26

Top of page Top of page


HWY 401 Westbound On-ramp [ WHITES ROAD Southbound - ] - Recurring-Construction
Highway:HWY 401
Direction:Westbound
From/At:WHITES ROAD Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 23, 2017 23:59
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-19 12:24

Top of page Top of page


HWY 402 Eastbound [ Thames River - Thames River ] - Construction
Highway:HWY 402
Direction:Eastbound
From/At:Thames River
To:Thames River
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 402 eastbound and westbound, at the Thames River, London, reduced from 2 lanes to a single lane of traffic, Monday, November 20th, 2017 at 0000 hours until Friday, November 24th, 2017 at 2400 hours, for construction work operations, weather permitting and advance signing in place.
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 23:59
Last Change: Entered 2017-11-20 22:38

Top of page Top of page


HWY 403 HAMILTON Eastbound [ CITY OF HAMILTON-COUNTY OF BRANT TOWNLINE - BRANT STREET ] - Recurring-Maintenance
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:CITY OF HAMILTON-COUNTY OF BRANT TOWNLINE
To:BRANT STREET
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 26, 2017 04:00
Last Change: Entered 2017-11-10 15:45

Top of page Top of page


HWY 403 HAMILTON Eastbound [ Paris Road (33KM) - Paris Road (33KM) ] - Maintenance
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:Paris Road (33KM)
To:Paris Road (33KM)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Highway 403 eastbound, at Paris Road (Interchange 33), Brantford, reduced from 2 lanes to a single lane of traffic, Wednesday, November 22nd, 2017, from 0800 hours until 0930 hours, for maintenance work operations, weather permitting.
Event Start:November 22, 2017 08:00
Event End:November 22, 2017 09:30
Last Change: Entered 2017-11-20 22:14

Top of page Top of page


HWY 403 HAMILTON Eastbound Off-ramp [ - HWY 6 NORTH Northbound ] - Recurring-Maintenance
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:
To:HWY 6 NORTH Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 22, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-20 15:58

Top of page Top of page


HWY 403 HAMILTON Eastbound On-ramp [ Oxford County Rd 55 (5KM) Southbound - ] - Construction
Highway:HWY 403 HAMILTON
Direction:Eastbound
From/At:Oxford County Rd 55 (5KM) Southbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Highway 403 Eastbound on-ramp from Southbound Oxford Road 55 will be closed from July 31, 2017 until November, 2017
Event Start:July 31, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-07-21 10:56

Top of page Top of page


HWY 403 HAMILTON Westbound [ BRANT STREET - CITY OF HAMILTON-COUNTY OF BRANT TOWNLINE ] - Recurring-Maintenance
Highway:HWY 403 HAMILTON
Direction:Westbound
From/At:BRANT STREET
To:CITY OF HAMILTON-COUNTY OF BRANT TOWNLINE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 26, 2017 04:30
Last Change: Entered 2017-11-10 15:51

Top of page Top of page


HWY 403 HAMILTON Westbound On-ramp [ KING STREET WEST Westbound - ] - Recurring-Maintenance
Highway:HWY 403 HAMILTON
Direction:Westbound
From/At:KING STREET WEST Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 22, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-20 16:02

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ EGLINTON AVE Collector - MATHESON BLVD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:EGLINTON AVE Collector
To:MATHESON BLVD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from EGLINTON AVE EB, On-ramp from EGLINTON AVE WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closure at 22:00, 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 22:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:31

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ ERIN MILLS PKWY Collector - MAVIS ROAD Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:ERIN MILLS PKWY Collector
To:MAVIS ROAD Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closed 2200-0500. Sun: 1 lane closed 2300-0700.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-15 08:52

Top of page Top of page


HWY 403 MISSISSAUGA Eastbound Collector [ HWY 407 ETR Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Eastbound
From/At:HWY 407 ETR Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sun-Thu: HOV closes at 2000, expanding to 2 lanes at 2200, expanding to 3 lanes at 0100. 1 lane reopens at 0400, full reopen at 0500. Fri: HOV lane closes at 2000, expanding to 2 lanes at 2300, expanding to 3 lanes at 0100. Full reopen at 0500.
Event Start:November 19, 2017 20:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-15 08:37

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ ERIN MILLS PKWY Collector - HWY 407 ETR Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:ERIN MILLS PKWY Collector
To:HWY 407 ETR Collector
Lanes Affected:3 Left(with HOV) Lane(s)
Traffic Impact :On-ramp from WINSTON CHURCHILL BLVD NB, On-ramp from WINSTON CHURCHILL BLVD SB, Off-ramp to WINSTON CHURCHILL BLVD NB/SB
ReasonRecurring-Construction
Comment :Sun-Thu: HOV closes at 2000, expanding to 2 lanes at 2300, expanding to 3 lanes at 0100. 1 lane reopens at 0400. Full reopen at 0600. Fri: HOV closes at 2200, expanding to 2 lanes at 2359, expanding to 3 lanes at 0100. 1 lane reopens at 0500. Full reopen at 0600.
Event Start:November 19, 2017 20:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-15 08:32

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:1 Left(with HOV) Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: HOV lane closed 2000-0600. Fri: HOV lane closed 2200-0600.
Event Start:November 19, 2017 20:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-15 08:40

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MATHESON BLVD Collector - HURONTARIO STREET Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MATHESON BLVD Collector
To:HURONTARIO STREET Collector
Lanes Affected:3 Right Lane(s)
Traffic Impact :On-ramp from EASTGATE DRIVE NB/SB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closed at 23:00 expanding to a 2 lane closure at 23:59 and a 3 lane closure at 02:00. 1 lane reopens at 05:00, 2 lanes reopen at 05:30 and full reopen at 06:00. Monday to Thursday: 1 lane closed at 23:00 expanding to a 2 lane closure at 23:59 and a 3 lane closure at 01:00. 1 lane reopens at 04:00, 2 lanes reopen at 05:30 and full reopen at 06:00. Friday: 1 lane closed at 23:59 expanding to 3 lane closure at 01:00. 1 lane reopens at 04:00, 2 lanes reopen at 05:30 and full reopen at 06:00
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-15 08:49

Top of page Top of page


HWY 403 MISSISSAUGA Westbound Collector [ MAVIS ROAD Collector - ERIN MILLS PKWY Collector ] - Recurring-Construction
Highway:HWY 403 MISSISSAUGA
Direction:Westbound
From/At:MAVIS ROAD Collector
To:ERIN MILLS PKWY Collector
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closed 2300-0600. Fri: 1 lane closed 2359-0600.
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-15 09:06

Top of page Top of page


HWY 404 Northbound [ 19TH AVE - 19TH AVE Collector ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:19TH AVE
To:19TH AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closes at 2200, expanding to 2 lanes at 2300. 1 lane reopens at 0500, full reopen at 0600. Fri: 2 lanes close at 2300, 1 lane reopens at 0700. Full reopen at 0800.
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 08:00
Last Change: Entered 2017-11-17 09:26

Top of page Top of page


HWY 404 Northbound [ BLOOMINGTON ROAD - VANDORF SIDEROAD ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:BLOOMINGTON ROAD
To:VANDORF SIDEROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Expanding closure: 1 lane closes at 2100, expanding to 2 lanes at 2300. 1 lane reopens at 0600. Full reopen at 0700.
Event Start:November 20, 2017 21:00
Event End:November 22, 2017 07:00
Last Change: Entered 2017-11-16 11:02

Top of page Top of page


HWY 404 Northbound [ JOHN ST - JOHN ST ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:JOHN ST
To:JOHN ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE / WOODBINE AVE WB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. All lanes reopen at 06:00.
Event Start:November 20, 2017 22:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 10:41

Top of page Top of page


HWY 404 Northbound [ MAJOR MACKENZIE DRIVE - STOUFFVILLE ROAD ] - Recurring-Engineering Investigation
Highway:HWY 404
Direction:Northbound
From/At:MAJOR MACKENZIE DRIVE
To:STOUFFVILLE ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from STOUFFVILLE ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB
ReasonRecurring-Engineering Investigation
Comment :Sun-Thu: 1 lane closed 2200-0600. Fri: 1 lane closed 2359-0800.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 08:00
Last Change: Entered 2017-11-15 17:22

Top of page Top of page


HWY 404 Northbound [ MCNICOLL AVE - MCNICOLL AVE ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:MCNICOLL AVE
To:MCNICOLL AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from FINCH AVE EB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. All lanes reopen at 06:00.
Event Start:November 20, 2017 22:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 10:46

Top of page Top of page


HWY 404 Northbound [ YORK MILLS ROAD - HWY 401 ] - Recurring-Construction
Highway:HWY 404
Direction:Northbound
From/At:YORK MILLS ROAD
To:HWY 401
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Tuesday: 2 lane closure at 23:59. 1 lane reopen at 5:00, full reopen at 6:00.
Event Start:November 21, 2017 23:59
Event End:November 22, 2017 06:00
Last Change: Entered 2017-11-21 08:07

Top of page Top of page


HWY 404 Northbound On-ramp [ HWY 7 Eastbound/Westbound - ] - Maintenance
Highway:HWY 404
Direction:Northbound
From/At:HWY 7 Eastbound/Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:November 24, 2017 23:00
Event End:November 27, 2017 05:00
Last Change: Entered 2017-11-15 11:45

Top of page Top of page


HWY 404 Southbound [ JOHN ST - JOHN ST ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:JOHN ST
To:JOHN ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00 1 lane all lanes reopen at 06:00.
Event Start:November 20, 2017 22:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 10:37

Top of page Top of page


HWY 404 Southbound [ MCNICOLL AVE - MCNICOLL AVE ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:MCNICOLL AVE
To:MCNICOLL AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE / WOODBINE AVE SB
ReasonRecurring-Construction
Comment :Monday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. All lanes reopen at 06:00.
Event Start:November 20, 2017 22:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 11:18

Top of page Top of page


HWY 404 Southbound [ STOUFFVILLE ROAD - MAJOR MACKENZIE DRIVE ] - Recurring-Engineering Investigation
Highway:HWY 404
Direction:Southbound
From/At:STOUFFVILLE ROAD
To:MAJOR MACKENZIE DRIVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to ELGIN MILLS ROAD EB/WB, Off-ramp to MAJOR MACKENZIE DRIVE EB/WB, On-ramp from STOUFFVILLE ROAD EB/WB, On-ramp from ELGIN MILLS ROAD EB/WB, On-ramp from MAJOR MACKENZIE DRIVE EB/WB, Off-ramp to STOUFFVILLE ROAD EB/WB
ReasonRecurring-Engineering Investigation
Comment :Sun: 1 lane closed 2300-0500. Mon: 1 lane closed 2000-0500. Tue-Thu: 1 lane closed 2100-0500. Fri: 1 lane closed 2100-0800.
Event Start:November 19, 2017 20:00
Event End:November 25, 2017 08:00
Last Change: Entered 2017-11-15 17:23

Top of page Top of page


HWY 404 Southbound [ VANDORF SIDEROAD - BLOOMINGTON ROAD ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:VANDORF SIDEROAD
To:BLOOMINGTON ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 21:00
Event End:November 22, 2017 06:00
Last Change: Entered 2017-11-16 10:58

Top of page Top of page


HWY 404 Southbound Collector [ 19TH AVE Collector - 19TH AVE Collector ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:19TH AVE Collector
To:19TH AVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closes at 2200, expanding to 2 lanes at 2300. 1 lane reopens at 0500, full reopen at 0600. Fri: 2 lanes close at 2300, 1 lane reopens at 0700. Full reopen at 0800.
Event Start:November 19, 2017 23:00
Event End:November 25, 2017 08:00
Last Change: Entered 2017-11-17 09:33

Top of page Top of page


HWY 404 Southbound Express [ SHEPPARD AVE Express - HWY 401 Express ] - Recurring-Construction
Highway:HWY 404
Direction:Southbound
From/At:SHEPPARD AVE Express
To:HWY 401 Express
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :Off-ramp to HOV TUNNEL TO 401 WB, On-ramp from HWY 401 WB
ReasonRecurring-Construction
Comment :No access to the HOV lane from the south of Finch Ave.
Event Start:November 20, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-15 16:26

Top of page Top of page


HWY 406 Northbound [ MERRITT ROAD - GLENDALE AVE ] - Construction
Highway:HWY 406
Direction:Northbound
From/At:MERRITT ROAD
To:GLENDALE AVE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-16 11:01

Top of page Top of page


HWY 406 Northbound Off-ramp [ - HWY 58 Southbound ] - Recurring-Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:HWY 58 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-16 11:03

Top of page Top of page


HWY 406 Northbound Off-ramp [ - ST DAVID'S ROAD Westbound ] - Construction
Highway:HWY 406
Direction:Northbound
From/At:
To:ST DAVID'S ROAD Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Permanently closed until December 22, 2017.
Event Start:November 18, 2017 00:00
Event End:December 22, 2017 23:59
Last Change: Entered 2017-11-16 11:06

Top of page Top of page


HWY 406 Southbound [ 4TH AVE - PEDESTRIAN BRIDGE ] - Recurring-Construction
Highway:HWY 406
Direction:Southbound
From/At:4TH AVE
To:PEDESTRIAN BRIDGE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 22, 2017 19:00
Event End:November 24, 2017 07:00
Last Change: Entered 2017-11-17 11:05

Top of page Top of page


HWY 406 Southbound [ GLENDALE AVE - BEAVERDAMS ROAD ] - Construction
Highway:HWY 406
Direction:Southbound
From/At:GLENDALE AVE
To:BEAVERDAMS ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 19, 2017 00:00
Event End:November 25, 2017 23:59
Last Change: Entered 2017-11-16 10:58

Top of page Top of page


HWY 406 Southbound Off-ramp [ - WESTCHESTER AVE Eastbound/Westbound ] - Recurring-Construction
Highway:HWY 406
Direction:Southbound
From/At:
To:WESTCHESTER AVE Eastbound/Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :406SB-Westchester EB/WB Off-Ramp - Tuesday-Wednesday: 1 lane closure at 21:00, 2 lane closure at 22:00. Full reopen at 6:00.
Event Start:November 21, 2017 21:00
Event End:November 23, 2017 06:00
Last Change: Entered 2017-11-17 16:50

Top of page Top of page


HWY 407 ETR Eastbound [ BALDWIN ST S - ANDERSON ST ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:BALDWIN ST S
To:ANDERSON ST
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:32

Top of page Top of page


HWY 407 ETR Eastbound [ SIDELINE 14 - SALEM RD ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:SIDELINE 14
To:SALEM RD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 21, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-17 12:41

Top of page Top of page


HWY 407 ETR Eastbound [ WESTNEY RD N - SALEM RD ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:WESTNEY RD N
To:SALEM RD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:24

Top of page Top of page


HWY 407 ETR Eastbound Off-ramp [ - HWY 412 Southbound ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:
To:HWY 412 Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:09

Top of page Top of page


HWY 407 ETR Eastbound Off-ramp [ - SIMCOE ST Northbound/Southbound ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:
To:SIMCOE ST Northbound/Southbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 22, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:10

Top of page Top of page


HWY 407 ETR Eastbound On-ramp [ BALDWIN ST S Northbound - ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:BALDWIN ST S Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 21, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-20 14:46

Top of page Top of page


HWY 407 ETR Eastbound On-ramp [ THICKSON RD Northbound - ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Eastbound
From/At:THICKSON RD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 21, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-20 14:46

Top of page Top of page


HWY 407 ETR Westbound [ ST THOMAS ST - BALDWIN ST S ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:ST THOMAS ST
To:BALDWIN ST S
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:34

Top of page Top of page


HWY 407 ETR Westbound [ THORNTON RD N - THICKSON RD ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:THORNTON RD N
To:THICKSON RD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:19

Top of page Top of page


HWY 407 ETR Westbound [ WESTNEY RD N - SIDELINE 14 ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:WESTNEY RD N
To:SIDELINE 14
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:21

Top of page Top of page


HWY 407 ETR Westbound Off-ramp [ - THICKSON RD Northbound/Southbound ] - Recurring-Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:
To:THICKSON RD Northbound/Southbound
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:31

Top of page Top of page


HWY 407 ETR Westbound On-ramp [ HARMONY RD N Northbound - ] - Construction
Highway:HWY 407 ETR
Direction:Westbound
From/At:HARMONY RD N Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :On-ramp from Harmony Road northbound closed from 9:00 a.m. on Sunday November 19th to 5:00 p.m. on Wednesday November 22nd, 2017.
Event Start:November 19, 2017 09:00
Event End:November 22, 2017 17:00
Last Change: Entered 2017-11-16 13:19

Top of page Top of page


HWY 409 Eastbound [ CARLINGVIEW DRIVE - HWY 401 ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:CARLINGVIEW DRIVE
To:HWY 401
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sat: 1 lane closure at 2200, expanding to 2 lanes at 2359. 1 lane reopens at 0800. Full reopen at 1000. Sun: 1 lane closure at 2100, expanding to 2 lanes at 2359. Full reopen at 0500. Mon-Wed: 1 lane closure at 2200, expanding to 2 lanes at 2300. Full reopen at 0500.
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 13:56

Top of page Top of page


HWY 409 Eastbound Off-ramp [ - MARTIN GROVE ROAD Eastbound/Westbound ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:
To:MARTIN GROVE ROAD Eastbound/Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:44

Top of page Top of page


HWY 409 Eastbound On-ramp [ KIPLING AVE/BELFIELD ROAD Eastbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:KIPLING AVE/BELFIELD ROAD Eastbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:48

Top of page Top of page


HWY 409 Eastbound On-ramp [ KIPLING AVE/BELFIELD ROAD Westbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:KIPLING AVE/BELFIELD ROAD Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:49

Top of page Top of page


HWY 409 Eastbound On-ramp [ MARTIN GROVE ROAD Eastbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:MARTIN GROVE ROAD Eastbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:46

Top of page Top of page


HWY 409 Eastbound On-ramp [ MARTIN GROVE ROAD Westbound - ] - Recurring-Construction
Highway:HWY 409
Direction:Eastbound
From/At:MARTIN GROVE ROAD Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 18, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-16 14:47

Top of page Top of page


HWY 410 Northbound [ CLARK BLVD - QUEEN STREET/S JCT HWY 7 ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:CLARK BLVD
To:QUEEN STREET/S JCT HWY 7
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 6:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 07:35

Top of page Top of page


HWY 410 Northbound [ COURTNEY PARK DRIVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:COURTNEY PARK DRIVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to DERRY ROAD EB/WB, Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:32

Top of page Top of page


HWY 410 Northbound [ DERRY ROAD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:DERRY ROAD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from DERRY ROAD EB/WB, On-ramp from DERRY ROAD WB, Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:33

Top of page Top of page


HWY 410 Northbound [ HWY 401 - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:HWY 401
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to COURTNEY PARK DRIVE EB/WB
ReasonRecurring-Construction
Comment :Sunday to Thursday: 2 lane closure at 23:59. Full reopen at 05:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:30

Top of page Top of page


HWY 410 Northbound [ QUEEN STREET/S JCT HWY 7 - VODDEN ST ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:QUEEN STREET/S JCT HWY 7
To:VODDEN ST
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Friday: 1 lane closure at 22:00, 2 lane closure at 23:59. 1 lane reopen at 6:00, full reopen at 7:00.
Event Start:November 24, 2017 22:00
Event End:November 25, 2017 07:00
Last Change: Entered 2017-11-19 12:08

Top of page Top of page


HWY 410 Northbound [ STEELES AVE - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Northbound
From/At:STEELES AVE
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to CLARK BLVD EB/WB
ReasonRecurring-Construction
Comment :Sunday: 2 lane closure at 23:59. Full reopen at 6:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 6:00.
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 07:34

Top of page Top of page


HWY 410 Southbound [ CLARK BLVD - STEELES AVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:CLARK BLVD
To:STEELES AVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to STEELES AVE EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:27

Top of page Top of page


HWY 410 Southbound [ COURTNEY PARK DRIVE - HWY 401 ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:COURTNEY PARK DRIVE
To:HWY 401
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23:59. Full reopen at 5:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 5:00.
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:29

Top of page Top of page


HWY 410 Southbound [ DERRY ROAD - COURTNEY PARK DRIVE ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:DERRY ROAD
To:COURTNEY PARK DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from DERRY ROAD EB, On-ramp from COURTNEY PARK DRIVE EB/WB, On-ramp from DERRY ROAD WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lane closure at 23:59. Full reopen at 5:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:29

Top of page Top of page


HWY 410 Southbound [ QUEEN STREET/S JCT HWY 7 - CLARK BLVD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:QUEEN STREET/S JCT HWY 7
To:CLARK BLVD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from QUEEN STREET/S JCT HWY 7 EB, On-ramp from CLARK BLVD EB/WB, On-ramp from QUEEN STREET/S JCT HWY 7 WB, Off-ramp to QUEEN STREET/S JCT HWY 7 EB/WB
ReasonRecurring-Construction
Comment :Sunday-Thursday: 2 lanes closed at 23:59 and all lanes reopen at 05:00.
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:26

Top of page Top of page


HWY 410 Southbound [ STEELES AVE - DERRY ROAD ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:STEELES AVE
To:DERRY ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from STEELES AVE EB, On-ramp from STEELES AVE WB, Off-ramp to DERRY ROAD EB/WB
ReasonRecurring-Construction
Comment :Sunday: 1 lane closure at 23:00, 2 lane closure at 23:59. Full reopen at 5:00. Monday-Thursday: 2 lane closure at 23:00. Full reopen at 5:00.
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 07:28

Top of page Top of page


HWY 410 Southbound Off-ramp [ - HWY 401 Eastbound/Westbound ] - Recurring-Construction
Highway:HWY 410
Direction:Southbound
From/At:
To:HWY 401 Eastbound/Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Thursday-Friday: 1 lane closure at 22:00, 3 lane closure at 23:00. Full reopen at 5:00.
Event Start:November 23, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-21 14:00

Top of page Top of page


HWY 412 Northbound [ HWY 7 - HWY 407 ETR ] - Recurring-Construction
Highway:HWY 412
Direction:Northbound
From/At:HWY 7
To:HWY 407 ETR
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 21, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:04

Top of page Top of page


HWY 412 Northbound Off-ramp [ - HWY 407 ETR Westbound ] - Recurring-Construction
Highway:HWY 412
Direction:Northbound
From/At:
To:HWY 407 ETR Westbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:06

Top of page Top of page


HWY 412 Southbound [ HWY 7 - TAUNTON RD ] - Recurring-Construction
Highway:HWY 412
Direction:Southbound
From/At:HWY 7
To:TAUNTON RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:12

Top of page Top of page


HWY 412 Southbound Off-ramp [ - HWY 401 Eastbound ] - Recurring-Construction
Highway:HWY 412
Direction:Southbound
From/At:
To:HWY 401 Eastbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:17

Top of page Top of page


HWY 412 Southbound Off-ramp [ - HWY 401 Westbound ] - Recurring-Construction
Highway:HWY 412
Direction:Southbound
From/At:
To:HWY 401 Westbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 16:00
Last Change: Entered 2017-11-17 12:13

Top of page Top of page


HWY 417 Eastbound [ CPR OH CROSSING EAST OF INNES RD - CPR OH CROSSING EAST OF INNES RD ] - Maintenance
Highway:HWY 417
Direction:Eastbound
From/At:CPR OH CROSSING EAST OF INNES RD
To:CPR OH CROSSING EAST OF INNES RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Ottawa
Event Start:November 22, 2017 21:00
Event End:November 23, 2017 06:00
Last Change: Entered 2017-11-21 19:41

Top of page Top of page


HWY 417 Eastbound [ MAITLAND AVE (IC 126) - CARLING AVE / KIRKWOOD AVE (IC 124) ] - Construction
Highway:HWY 417
Direction:Eastbound
From/At:MAITLAND AVE (IC 126)
To:CARLING AVE / KIRKWOOD AVE (IC 124)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Left lane closed Hwy 417 E/B Maitland to Carling (Ottawa)
Event Start:November 22, 2017 10:00
Event End:November 22, 2017 14:30
Last Change: Entered 2017-11-17 11:25

Top of page Top of page


HWY 417 Eastbound [ MAITLAND AVE (IC 126) - CARLING AVE / KIRKWOOD AVE (IC 124) ] - Construction
Highway:HWY 417
Direction:Eastbound
From/At:MAITLAND AVE (IC 126)
To:CARLING AVE / KIRKWOOD AVE (IC 124)
Lanes Affected:2 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Left lanes closed Hwy 417 E/B Maitland to Carling (Ottawa)
Event Start:November 22, 2017 22:00
Event End:November 23, 2017 02:00
Last Change: Entered 2017-11-21 17:48

Top of page Top of page


HWY 417 Eastbound [ P&R CTY RD 17 (IC 9) - ONTARIO/QUEBEC BDY ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:P&R CTY RD 17 (IC 9)
To:ONTARIO/QUEBEC BDY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 E/B & W/B btwn Cty Rd 17 and Quebec Border (W/ON-QC Border); W/B Travel Information Centre ramps closed as required.
Event Start:November 20, 2017 00:00
Event End:November 24, 2017 23:59
Last Change: Entered 2017-11-16 13:54

Top of page Top of page


HWY 417 Eastbound [ RAMSAYVILLE RD - BOUNDARY RD (IC 96) ] - Recurring-Construction
Highway:HWY 417
Direction:Eastbound
From/At:RAMSAYVILLE RD
To:BOUNDARY RD (IC 96)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 E/B btwn Ramsayville Rd and Boundary Rd (E/Ottawa)
Event Start:November 20, 2017 03:00
Event End:November 24, 2017 14:30
Last Change: Entered 2017-11-16 14:04

Top of page Top of page


HWY 417 Westbound [ AVIATION PKWY (IC 113A) - ST. LAURENT BLVD (IC 115) ] - Engineering Investigation
Highway:HWY 417
Direction:Westbound
From/At:AVIATION PKWY (IC 113A)
To:ST. LAURENT BLVD (IC 115)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonEngineering Investigation
Comment :Left lane closed Hwy 417 W/B btwn Aviation Pkwy and St. Laurent (Ottawa)
Event Start:December 03, 2017 22:00
Event End:December 04, 2017 06:00
Last Change: Entered 2017-11-20 11:56

Top of page Top of page


HWY 417 Westbound [ BOUNDARY RD (IC 96) - RAMSAYVILLE RD ] - Recurring-Construction
Highway:HWY 417
Direction:Westbound
From/At:BOUNDARY RD (IC 96)
To:RAMSAYVILLE RD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 W/B btwn Boundary Rd and Ramsayville Rd (E/Ottawa)
Event Start:November 20, 2017 10:00
Event End:November 24, 2017 20:00
Last Change: Entered 2017-11-16 13:59

Top of page Top of page


HWY 417 Westbound [ CPR OH CROSSING EAST OF INNES RD - CPR OH CROSSING EAST OF INNES RD ] - Maintenance
Highway:HWY 417
Direction:Westbound
From/At:CPR OH CROSSING EAST OF INNES RD
To:CPR OH CROSSING EAST OF INNES RD
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Ottawa
Event Start:November 22, 2017 21:00
Event End:November 23, 2017 06:00
Last Change: Entered 2017-11-21 19:44

Top of page Top of page


HWY 417 Westbound [ LYON ST (IC 120B) - LYON ST (IC 120B) ] - Maintenance
Highway:HWY 417
Direction:Westbound
From/At:LYON ST (IC 120B)
To:LYON ST (IC 120B)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Left lane closed Hwy 417 W/B at Lyon Ave (Ottawa)
Event Start:November 21, 2017 21:00
Event End:November 22, 2017 06:00
Last Change: Entered 2017-11-19 09:03

Top of page Top of page


HWY 417 Westbound [ O'CONNOR ST (IC 119B) - BRONSON AVE (IC 121A) ] - Recurring-Maintenance
Highway:HWY 417
Direction:Westbound
From/At:O'CONNOR ST (IC 119B)
To:BRONSON AVE (IC 121A)
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Left lane closed Hwy 417 W/B btwn O'Connor and Bronson (Ottawa)
Event Start:November 21, 2017 21:00
Event End:November 23, 2017 06:00
Last Change: Entered 2017-11-17 10:57

Top of page Top of page


HWY 417 Westbound [ OTTAWA RD 174 (IC 113) - ST. LAURENT BLVD (IC 115) ] - Recurring-Engineering Investigation
Highway:HWY 417
Direction:Westbound
From/At:OTTAWA RD 174 (IC 113)
To:ST. LAURENT BLVD (IC 115)
Lanes Affected:3 Right Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :Right lanes closed Hwy 417 W/B from Hwy 417/174 Split to St. Laurent (Ottawa); Hwy 174 W/B closed west of Blair. Traffic detoured via St. Laurent interchange
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-03 11:27

Top of page Top of page


HWY 417 Westbound [ TERRY FOX DR (IC 140) - PALLADIUM DR (IC 142) ] - Recurring-Construction
Highway:HWY 417
Direction:Westbound
From/At:TERRY FOX DR (IC 140)
To:PALLADIUM DR (IC 142)
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Lane reductions Hwy 417 E/B & W/B btwn Terry Fox and Palladium (Ottawa); E/B Palladium on ramp and W/B Palladium off ramp closed as required
Event Start:November 23, 2017 21:00
Event End:November 28, 2017 05:00
Last Change: Entered 2017-11-17 14:34

Top of page Top of page


HWY 417 Westbound Off-ramp [ - ISLAND PARK DR E/B (IC 123) Northbound ] - Recurring-Maintenance
Highway:HWY 417
Direction:Westbound
From/At:
To:ISLAND PARK DR E/B (IC 123) Northbound
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :Lane reduction Hwy 417 W/B Island Park off ramp (Ottawa)
Event Start:November 23, 2017 21:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-17 11:14

Top of page Top of page


HWY 420 Westbound [ DRUMMOND ROAD - DORCHESTER ROAD/LUNDY'S LANE ] - Recurring-Construction
Highway:HWY 420
Direction:Westbound
From/At:DRUMMOND ROAD
To:DORCHESTER ROAD/LUNDY'S LANE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 22, 2017 09:00
Event End:November 22, 2017 15:00
Last Change: Entered 2017-11-20 16:31

Top of page Top of page


HWY 420 Westbound Off-ramp [ - QEW Northbound ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:
To:QEW Northbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 18, 2017 00:00
Event End:April 30, 2018 23:59
Last Change: Entered 2017-11-17 09:10

Top of page Top of page


HWY 420 Westbound On-ramp [ DORCHESTER ROAD/LUNDY'S LANE Westbound - ] - Construction
Highway:HWY 420
Direction:Westbound
From/At:DORCHESTER ROAD/LUNDY'S LANE Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 18, 2017 00:00
Event End:April 30, 2018 23:59
Last Change: Entered 2017-11-17 09:13

Top of page Top of page


HWY 427 Northbound [ FINCH AVENUE - HWY 7 ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:FINCH AVENUE
To:HWY 7
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday to Friday: Left lane closed on Highway 427 NB between Finch Ave to Highway 7 from 2200 to 0500.
Event Start:November 18, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 13:25

Top of page Top of page


HWY 427 Northbound Collector Off-ramp [ - CAMPUS ROAD/FASKEN DRIVE Eastbound/Westbound ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:
To:CAMPUS ROAD/FASKEN DRIVE Eastbound/Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Tue-Wed: Full, 1 out of 1, lane closed at 2200; all lanes opened at 0600.
Event Start:November 21, 2017 22:00
Event End:November 22, 2017 06:00
Last Change: Entered 2017-11-21 06:14

Top of page Top of page


HWY 427 Northbound Collector Off-ramp [ - HWY 409 Eastbound ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:
To:HWY 409 Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Tue-Wed: Full, 1 out of 1, lane closed at 2200; all lanes opened at 0600.
Event Start:November 21, 2017 22:00
Event End:November 22, 2017 06:00
Last Change: Entered 2017-11-21 06:08

Top of page Top of page


HWY 427 Northbound Collector [ CAMPUS ROAD/FASKEN DRIVE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Northbound
From/At:CAMPUS ROAD/FASKEN DRIVE Collector
To:REXDALE BLVD / DERRY ROAD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closes at 1900, expanding to 2 lanes at 2000. Full reopen at 0600. Fri: 1 lane closes at 2000, expanding to 2 lanes at 2100. Full reopen at 0600.
Event Start:November 19, 2017 19:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-17 00:38

Top of page Top of page


HWY 427 Southbound [ HWY 7 - FINCH AVENUE ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:HWY 7
To:FINCH AVENUE
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Monday to Friday: Left lane closed on Highway 427 SB between Highway 7 and Finch Ave from 2200 to 0500.
Event Start:November 18, 2017 22:00
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-16 13:23

Top of page Top of page


HWY 427 Southbound Collector [ FINCH AVENUE Collector - REXDALE BLVD / DERRY ROAD Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:FINCH AVENUE Collector
To:REXDALE BLVD / DERRY ROAD Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from FINCH AVENUE EB
ReasonRecurring-Construction
Comment :Sun-Thu: 1 lane closed at 19:00 expanding to a 2 lane closure at 22:00. 1 lane reopens at 05:00 and all lanes reopen at 06:00. Fri: 1 lane closed at 20:00 expanding to a 2 lane closure at 21:00. Full reopen at 06:00
Event Start:November 19, 2017 19:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-17 00:42

Top of page Top of page


HWY 427 Southbound Collector [ REXDALE BLVD / DERRY ROAD Collector - CAMPUS ROAD/FASKEN DRIVE Collector ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:REXDALE BLVD / DERRY ROAD Collector
To:CAMPUS ROAD/FASKEN DRIVE Collector
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Sunday-Thursday: 1 lane closed at 22:00, 2 lanes closed at 23:00. 1 lane reopens at 05:00 and full reopen at 06:00. Friday: 1 lane closed at 23:00, 2 lanes closed at 23:59. Full reopen at 0600.
Event Start:November 19, 2017 22:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-17 00:33

Top of page Top of page


HWY 427 Southbound On-ramp [ HWY 409 Eastbound - ] - Recurring-Construction
Highway:HWY 427
Direction:Southbound
From/At:HWY 409 Eastbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :Full, 1 out of 1 lane, closed at 2359; all lanes opened at 0500.
Event Start:November 21, 2017 23:59
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-21 06:05

Top of page Top of page


HWY 49 Northbound [ Prince Edward Rd 15 - Airport Rd / Bayshore Rd ] - Maintenance
Highway:HWY 49
Direction:Northbound
From/At:Prince Edward Rd 15
To:Airport Rd / Bayshore Rd
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Alternating lane closure SB and NB between Airport Rd and CR 15.
Event Start:November 24, 2017 09:00
Event End:November 24, 2017 12:00
Last Change: Entered 2017-11-21 17:41

Top of page Top of page


HWY 49 Southbound [ Airport Rd / Bayshore Rd - Prince Edward Rd 15 ] - Construction
Highway:HWY 49
Direction:Southbound
From/At:Airport Rd / Bayshore Rd
To:Prince Edward Rd 15
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Alternating lane closure SB and NB between Airport Rd and CR 15.
Event Start:November 24, 2017 09:00
Event End:November 24, 2017 12:00
Last Change: Entered 2017-11-21 17:44

Top of page Top of page


HWY 6 Northbound [ Grey Road 17 - Grey Road 17 ] - Recurring-Construction
Highway:HWY 6
Direction:Northbound
From/At:Grey Road 17
To:Grey Road 17
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:October 02, 2017 07:00
Event End:November 06, 2018 19:00
Last Change: Entered 2017-09-29 16:29

Top of page Top of page


HWY 6 Northbound [ Highway 401 / Highway 6 North - Wellington Road 34 / County Road 34 ] - Construction
Highway:HWY 6
Direction:Northbound
From/At:Highway 401 / Highway 6 North
To:Wellington Road 34 / County Road 34
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 6 Northbound and Southbound from Highway 401 to Wellington road 34 will have right lane closures from October 26th at 0830 hours until December 10th at 1730 hours
Event Start:October 26, 2017 08:30
Event End:December 10, 2017 17:30
Last Change: Entered 2017-10-23 15:28

Top of page Top of page


HWY 6 Northbound [ King Street / Haldimand Road 20 - Mississauga Road / Haldimand 1st Line ] - Recurring-Construction
Highway:HWY 6
Direction:Northbound
From/At:King Street / Haldimand Road 20
To:Mississauga Road / Haldimand 1st Line
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 6 (northbound and southbound) from the north limit of Hagersville to 0.3 kilometres north of First Line will be having alternating daily lane restrictions as required with use of flagmen and/or temporary traffic signals. Project duration is July 4, 2017 to December 2017, Lane restrictions are permitted Monday to Friday 00:00 hours to 16:00 hours and 18:00 hours to 24:00 hours (no night work is currently scheduled).
Event Start:July 10, 2017 00:00
Event End:December 31, 2017 23:59
Last Change: Entered 2017-07-10 10:49

Top of page Top of page


HWY 6 Southbound [ 18th Sideroad / Edges Sideroad - 18th Sideroad / Edges Sideroad ] - Maintenance
Highway:HWY 6
Direction:Southbound
From/At:18th Sideroad / Edges Sideroad
To:18th Sideroad / Edges Sideroad
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonMaintenance
Comment :Highway 6 southbound, at West Grey Sideroad 18, Durham / Mount Forest, reduced to a single lane of traffic short duration(s), Wednesday, November 22nd, 2017, from 0800 hours until 1700 hours, for maintenance work operations, traffic control provided by flag persons, weather permitting and advanced signing in place.
Event Start:November 22, 2017 08:00
Event End:November 22, 2017 17:00
Last Change: Entered 2017-11-21 20:19

Top of page Top of page


HWY 6/21 Northbound [ Highway 6 / County Road 18 - Nichol's Gully Road / 9th Ave West ] - Recurring-Construction
Highway:HWY 6/21
Direction:Northbound
From/At:Highway 6 / County Road 18
To:Nichol's Gully Road / 9th Ave West
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 21 alternating directions, between Grey Road 18 and 9th Avenue, Springmount / Owen Sound, various lane closures, Monday, November 20th, 2017 until Friday, November 24th, 2017, daily, from 0700 hours until 1900 hours, for construction work operations, weather permitting, with reduced speed and advanced signing in place.
Event Start:November 20, 2017 07:00
Event End:November 24, 2017 19:00
Last Change: Entered 2017-11-17 17:40

Top of page Top of page


HWY 7 Eastbound [ Asphodel 6Th Line - Asphodel 7Th Line ] - Recurring-Construction
Highway:HWY 7
Direction:Eastbound
From/At:Asphodel 6Th Line
To:Asphodel 7Th Line
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Traffic may encounter single lane closures with flagging operations on Hwy 7 west of Norwood
Event Start:November 20, 2017 07:00
Event End:November 22, 2017 16:30
Last Change: Entered 2017-11-17 11:39

Top of page Top of page


HWY 7 Eastbound [ MCNEELY AVE - MCNEELY AVE ] - Construction
Highway:HWY 7
Direction:Eastbound
From/At:MCNEELY AVE
To:MCNEELY AVE
Lanes Affected:2 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Lane reductions Hwy 7 E/B & W/B @ McNeely Ave (Carleton Place)
Event Start:November 22, 2017 08:00
Event End:November 22, 2017 18:00
Last Change: Entered 2017-11-20 08:28

Top of page Top of page


HWY 7 Eastbound [ PICKERING SIDELINE 34 - PICKERING SIDELINE 32 ] - Recurring-Construction
Highway:HWY 7
Direction:Eastbound
From/At:PICKERING SIDELINE 34
To:PICKERING SIDELINE 32
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 15:47

Top of page Top of page


HWY 7 Westbound [ PICKERING SIDELINE 32 - PICKERING SIDELINE 34 ] - Recurring-Construction
Highway:HWY 7
Direction:Westbound
From/At:PICKERING SIDELINE 32
To:PICKERING SIDELINE 34
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :This is a flagging operation and 1 through lane will be maintained
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 15:42

Top of page Top of page


HWY 7 Westbound [ YORK/DURHAM ROAD 30 - LITTLE ROUGE CREEK ] - Recurring-Construction
Highway:HWY 7
Direction:Westbound
From/At:YORK/DURHAM ROAD 30
To:LITTLE ROUGE CREEK
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 15:50

Top of page Top of page


HWY 7/12 Northbound [ CONCESSION ROAD 2/BROCK TWP 2ND LINE - HIGHWAY 7A ] - Recurring-Maintenance
Highway:HWY 7/12
Direction:Northbound
From/At:CONCESSION ROAD 2/BROCK TWP 2ND LINE
To:HIGHWAY 7A
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :This is a flagging operation and 1 through lane will be maintained
Event Start:November 22, 2017 07:00
Event End:November 24, 2017 19:00
Last Change: Entered 2017-11-19 14:27

Top of page Top of page


HWY 7/12 Northbound [ CRAGG ROAD - COUVES LANE ] - Recurring-Maintenance
Highway:HWY 7/12
Direction:Northbound
From/At:CRAGG ROAD
To:COUVES LANE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :1 through lane maintained by flagging operation.
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 13:07

Top of page Top of page


HWY 7/12 Northbound [ DOBLE STREET - DURHAM ROAD 10 / RIVER STREET / 6TH LINE ] - Recurring-Maintenance
Highway:HWY 7/12
Direction:Northbound
From/At:DOBLE STREET
To:DURHAM ROAD 10 / RIVER STREET / 6TH LINE
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :1 through lane maintained by flagging operations.
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 12:01

Top of page Top of page


HWY 7/8 Eastbound [ Fischer-Hallman Road - Homer Watson Boulevard ] - Recurring-Construction
Highway:HWY 7/8
Direction:Eastbound
From/At:Fischer-Hallman Road
To:Homer Watson Boulevard
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Highway 7/8 eastbound and westbound, from Fischer Hallman Road to Homer Watson Boulevard, will have alternating lane closures from 0700 hours to 1700 hours, on Wednesday, November 22nd, 2017, and Thursday, November 23rd, 2017, for construction purposes
Event Start:November 22, 2017 07:00
Event End:November 23, 2017 17:00
Last Change: Entered 2017-11-21 15:49

Top of page Top of page


HWY 7/8 Eastbound [ Stratford City Limits (east) - Stratford City Limits (east) ] - Special Event
Highway:HWY 7/8
Direction:Eastbound
From/At:Stratford City Limits (east)
To:Stratford City Limits (east)
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonSpecial Event
Comment :Highway 7/8 (Ontario Street) eastbound and westbound, between Downie Street and Nile Street, Stratford, temporarily closed to traffic, Sunday, November 26th, 2017, from 1600 hours until 1900 hours, for Stratford Santa's Parade of Lights, with a local detour in effect, traffic control provided by Stratford (City) Police Service and Stratford (City) Public Works Department (Further information: https://www.stratfordcanada.ca).
Event Start:November 26, 2017 16:00
Event End:November 26, 2017 19:00
Last Change: Entered 2017-11-21 18:29

Top of page Top of page


HWY 7A Westbound [ NESBITT LINE ROAD - REGIONAL ROAD 57 (BLACKSTOCK) ] - Recurring-Maintenance
Highway:HWY 7A
Direction:Westbound
From/At:NESBITT LINE ROAD
To:REGIONAL ROAD 57 (BLACKSTOCK)
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :1 through lane maintained by flagging operations.
Event Start:November 20, 2017 09:00
Event End:November 24, 2017 15:00
Last Change: Entered 2017-11-10 11:55

Top of page Top of page


HWY 89 Eastbound [ Southgate Sideroad 13 - Southgate Sideroad 13 ] - Construction
Highway:HWY 89
Direction:Eastbound
From/At:Southgate Sideroad 13
To:Southgate Sideroad 13
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 89 east of Conn, will have alternating lane closures on Wednesday, November 22nd, 2017, from 0700 hours to 1800 hours for construction purposes
Event Start:November 22, 2017 07:00
Event End:November 22, 2017 18:00
Last Change: Entered 2017-11-21 11:51

Top of page Top of page


HWY 89 Eastbound [ Wellington Road 14 / County Road 14 - Sideroad 3 ] - Construction
Highway:HWY 89
Direction:Eastbound
From/At:Wellington Road 14 / County Road 14
To:Sideroad 3
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Highway 89 east of Conn, will have alternating lane closures on Wednesday, November 22nd, 2017, from 0700 hours to 1800 hours for construction purposes
Event Start:November 22, 2017 07:30
Event End:November 22, 2017 18:00
Last Change: Entered 2017-11-21 11:48

Top of page Top of page


QEW Fort Erie Bound [ BAKER ROAD - RIDGEMOUNT ROAD ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:BAKER ROAD
To:RIDGEMOUNT ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :On-ramp from NETHERBY ROAD NB
ReasonConstruction
Comment :
Event Start:June 02, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-05-29 16:02

Top of page Top of page


QEW Fort Erie Bound [ CREDIT RIVER - MISSISSAUGA ROAD ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:CREDIT RIVER
To:MISSISSAUGA ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 23:00
Event End:November 22, 2017 06:00
Last Change: Entered 2017-11-16 15:12

Top of page Top of page


QEW Fort Erie Bound [ GARDEN CITY SKYWAY - HWY 405 ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:GARDEN CITY SKYWAY
To:HWY 405
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 26, 2017 19:00
Event End:December 01, 2017 07:00
Last Change: Entered 2017-11-21 09:23

Top of page Top of page


QEW Fort Erie Bound [ GARDEN CITY SKYWAY - HWY 405 ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Fort Erie Bound
From/At:GARDEN CITY SKYWAY
To:HWY 405
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 19, 2017 19:00
Event End:November 24, 2017 07:00
Last Change: Entered 2017-11-14 15:10

Top of page Top of page


QEW Fort Erie Bound [ HWY 427 - HWY 10/HURONTARIO ] - Recurring-Maintenance
Highway:QEW
Direction:Fort Erie Bound
From/At:HWY 427
To:HWY 10/HURONTARIO
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-15 08:36

Top of page Top of page


QEW Fort Erie Bound [ JORDAN ROAD - JORDAN ROAD ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:JORDAN ROAD
To:JORDAN ROAD
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :On-ramp from JORDAN ROAD NB/SB, Off-ramp to JORDAN ROAD NB/SB
ReasonRecurring-Construction
Comment :Monday-Tuesday: 1 lane closure at 19:00, 2 lane closure at 22:00. 1 lane reopen at 5:00, full reopen at 7:00.
Event Start:November 20, 2017 19:00
Event End:November 22, 2017 07:00
Last Change: Entered 2017-11-17 10:57

Top of page Top of page


QEW Fort Erie Bound [ MCLEOD ROAD - MCLEOD ROAD ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:MCLEOD ROAD
To:MCLEOD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MCLEOD ROAD EB, On-ramp from MCLEOD ROAD WB, Off-ramp to MCLEOD ROAD EB/WB
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 20:42

Top of page Top of page


QEW Fort Erie Bound [ MISSISSAUGA ROAD - ERIN MILLS PKWY/SOUTHDOWN ROAD ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:MISSISSAUGA ROAD
To:ERIN MILLS PKWY/SOUTHDOWN ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :OPP assisted periodic closures of approximately 15 minutes.
Event Start:November 24, 2017 00:30
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 06:04

Top of page Top of page


QEW Fort Erie Bound [ THOMPSON ROAD - THOMPSON ROAD ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:THOMPSON ROAD
To:THOMPSON ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 12:00
Last Change: Entered 2017-11-15 13:09

Top of page Top of page


QEW Fort Erie Bound [ WELLAND RIVER BRIDGE - BECK ROAD ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WELLAND RIVER BRIDGE
To:BECK ROAD
Lanes Affected:1 Left Lane(s)
Traffic Impact :On-ramp from LYONS CREEK ROAD EB, On-ramp from LYONS CREEK ROAD WB
ReasonConstruction
Comment :
Event Start:May 17, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-05-15 10:57

Top of page Top of page


QEW Fort Erie Bound [ WINSTON CHURCHILL BLVD - ROYAL WINDSOR DRIVE ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WINSTON CHURCHILL BLVD
To:ROYAL WINDSOR DRIVE
Lanes Affected:2 Alternating Lane(s)
Traffic Impact :Off-ramp to FORD DRIVE NB/SB, On-ramp from HWY 403 OAKVILLE WB, On-ramp from FORD DRIVE NB, On-ramp from FORD DRIVE SB
ReasonRecurring-Construction
Comment :Mon-Thur: 1 lane closure at 21:00, 2 lane closure at 23:00. Full reopen at 6:00. Fri: 1 lane closure at 21:00, 2 lane closure at 23:00. 1 lane reopen at 7:00, full reopen at 8:00.
Event Start:November 20, 2017 20:00
Event End:November 25, 2017 06:00
Last Change: Entered 2017-11-15 17:24

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - BOWEN ROAD Eastbound/Westbound ] - Maintenance
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:BOWEN ROAD Eastbound/Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonMaintenance
Comment :
Event Start:November 23, 2017 00:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-20 14:37

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - CENTRAL AVENUE Eastbound ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:CENTRAL AVENUE Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 13:04

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - DORVAL DRIVE Northbound/Southbound ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:DORVAL DRIVE Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-14 06:34

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - FAIRVIEW STREET/PLAINS ROAD Eastbound/Westbound ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:FAIRVIEW STREET/PLAINS ROAD Eastbound/Westbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 23, 2017 23:59
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-19 14:38

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - HWY 406 Southbound ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:HWY 406 Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :Mon-Wed: Single lane closed at 2200, and expanding to two lanes closed at 2359. All lanes opened at 0500.
Event Start:November 20, 2017 22:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-15 14:35

Top of page Top of page


QEW Fort Erie Bound Off-ramp [ - WALKERS LINE Northbound/Southbound ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:
To:WALKERS LINE Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 21, 2017 22:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-14 06:31

Top of page Top of page


QEW Fort Erie Bound On-ramp [ DORVAL DRIVE Northbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:DORVAL DRIVE Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 23:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-14 06:36

Top of page Top of page


QEW Fort Erie Bound On-ramp [ FAIRVIEW STREET/PLAINS ROAD Eastbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:FAIRVIEW STREET/PLAINS ROAD Eastbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 23, 2017 23:59
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-19 14:40

Top of page Top of page


QEW Fort Erie Bound On-ramp [ FAIRVIEW STREET/PLAINS ROAD Westbound - ] - Recurring-Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:FAIRVIEW STREET/PLAINS ROAD Westbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 23, 2017 23:59
Event End:November 25, 2017 05:00
Last Change: Entered 2017-11-19 14:36

Top of page Top of page


QEW Fort Erie Bound On-ramp [ WALKERS LINE Northbound - ] - Construction
Highway:QEW
Direction:Fort Erie Bound
From/At:WALKERS LINE Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 21, 2017 23:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-14 06:31

Top of page Top of page


QEW Toronto bound [ BECK ROAD - WELLAND RIVER BRIDGE ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:BECK ROAD
To:WELLAND RIVER BRIDGE
Lanes Affected:1 Right Lane(s)
Traffic Impact :Off-ramp to LYONS CREEK ROAD EB/WB
ReasonConstruction
Comment :
Event Start:May 17, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-05-15 11:00

Top of page Top of page


QEW Toronto bound [ BURLINGTON ST - NORTHSHORE BLVD/HWY 2 ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:BURLINGTON ST
To:NORTHSHORE BLVD/HWY 2
Lanes Affected:3 Left Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :Fri: Two lanes closed at 2000, and expanding to a three lane closure at 2359; two lanes opened at 0800, and all lanes opened at 0700. Sat-Sun: No closures. Mon-Thu: Two lanes closed at 1900, and expanding to a three lanes closure at 2359; all lanes opened at 0500.
Event Start:November 17, 2017 20:00
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-10 11:50

Top of page Top of page


QEW Toronto bound [ ERIN MILLS PKWY/SOUTHDOWN ROAD - MISSISSAUGA ROAD ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:ERIN MILLS PKWY/SOUTHDOWN ROAD
To:MISSISSAUGA ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :OPP assisted periodic closures of approximately 15 minutes.
Event Start:November 24, 2017 00:30
Event End:November 24, 2017 05:00
Last Change: Entered 2017-11-15 06:00

Top of page Top of page


QEW Toronto bound [ HWY 10/HURONTARIO - HWY 427 ] - Recurring-Maintenance
Highway:QEW
Direction:Toronto bound
From/At:HWY 10/HURONTARIO
To:HWY 427
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonRecurring-Maintenance
Comment :
Event Start:November 19, 2017 23:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-15 08:39

Top of page Top of page


QEW Toronto bound [ HWY 405 - GARDEN CITY SKYWAY ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:HWY 405
To:GARDEN CITY SKYWAY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 19, 2017 19:00
Event End:November 24, 2017 07:00
Last Change: Entered 2017-11-14 15:14

Top of page Top of page


QEW Toronto bound [ HWY 405 - GARDEN CITY SKYWAY ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:HWY 405
To:GARDEN CITY SKYWAY
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 26, 2017 19:00
Event End:December 01, 2017 07:00
Last Change: Entered 2017-11-21 09:25

Top of page Top of page


QEW Toronto bound [ HWY 420 - HWY 420 ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:HWY 420
To:HWY 420
Lanes Affected:1 Left Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 18, 2017 00:00
Event End:December 01, 2017 23:59
Last Change: Entered 2017-11-17 09:06

Top of page Top of page


QEW Toronto bound [ HWY 420 - HWY 420 ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:HWY 420
To:HWY 420
Lanes Affected:1 Right Lane(s)
Traffic Impact :On-ramp from HWY 420 EB
ReasonRecurring-Construction
Comment :
Event Start:November 23, 2017 23:00
Event End:November 27, 2017 06:00
Last Change: Entered 2017-11-21 14:16

Top of page Top of page


QEW Toronto bound [ MCLEOD ROAD - MCLEOD ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:MCLEOD ROAD
To:MCLEOD ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :On-ramp from MCLEOD ROAD NB, On-ramp from MCLEOD ROAD SB, Off-ramp to MCLEOD ROAD NB/SB
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 20:47

Top of page Top of page


QEW Toronto bound [ RIDGEMOUNT ROAD - BAKER ROAD ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:RIDGEMOUNT ROAD
To:BAKER ROAD
Lanes Affected:1 Right Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:June 02, 2017 00:00
Event End:November 30, 2017 23:59
Last Change: Entered 2017-05-29 15:56

Top of page Top of page


QEW Toronto bound [ THIRD LINE - 4TH LINE ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:THIRD LINE
To:4TH LINE
Lanes Affected:2 Left(with HOV) Lane(s)
Traffic Impact :
ReasonConstruction
Comment :Friday-Sunday: 1 lane closure at 22:00, 2 lane closure at 23:00. Full reopen at 5:00.
Event Start:November 24, 2017 22:00
Event End:November 27, 2017 05:00
Last Change: Entered 2017-11-21 13:05

Top of page Top of page


QEW Toronto bound [ THOMPSON ROAD - THOMPSON ROAD ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:THOMPSON ROAD
To:THOMPSON ROAD
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:59
Event End:November 24, 2017 12:00
Last Change: Entered 2017-11-15 13:08

Top of page Top of page


QEW Toronto bound Off-ramp [ - CENTRAL AVENUE Eastbound ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:CENTRAL AVENUE Eastbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 19, 2017 23:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-11-15 13:07

Top of page Top of page


QEW Toronto bound Off-ramp [ - DORVAL DRIVE Northbound/Southbound ] - Recurring-Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:DORVAL DRIVE Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonRecurring-Construction
Comment :
Event Start:November 20, 2017 22:00
Event End:November 23, 2017 05:00
Last Change: Entered 2017-11-14 06:34

Top of page Top of page


QEW Toronto bound Off-ramp [ - THOMPSON ROAD Southbound ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:THOMPSON ROAD Southbound
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonConstruction
Comment :
Event Start:May 18, 2017 00:00
Event End:November 24, 2017 06:00
Last Change: Entered 2017-05-17 11:29

Top of page Top of page


QEW Toronto bound Off-ramp [ - WALKERS LINE Northbound/Southbound ] - Construction
Highway:QEW
Direction:Toronto bound
From/At:
To:WALKERS LINE Northbound/Southbound
Lanes Affected:1 Alternating Lane(s)
Traffic Impact :
ReasonConstruction
Comment :
Event Start:November 21, 2017 22:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-14 06:30

Top of page Top of page


QEW Toronto bound On-ramp [ MISSISSAUGA ROAD Northbound - ] - Recurring-Engineering Investigation
Highway:QEW
Direction:Toronto bound
From/At:MISSISSAUGA ROAD Northbound
To:
Lanes Affected:ALL LANES CLOSED
Traffic Impact :
ReasonRecurring-Engineering Investigation
Comment :
Event Start:November 20, 2017 23:00
Event End:November 22, 2017 05:00
Last Change: Entered 2017-11-16 15:09

Top of page Top of page


HWY 537 Both Directions [ CROSS RD-CLELAND TWP - S JCT ST CLOUD RD-CLELAND TWP ] - Flooding
Highway:HWY 537
Direction:Both Directions
From/At:CROSS RD-CLELAND TWP
To:S JCT ST CLOUD RD-CLELAND TWP
Lanes Affected:All lanes closed
Traffic Impact :
ReasonFlooding
Comment :HWY 537 CLOSED IN WAHNAPITAE FROM CROSS RD TO ST.CLOUD RD - JUMBO CREEK - UPDATED NOVEMBER 21 AT 2300 HOURS
Event Start:November 16, 2017 13:16
Event End:
Last Change: Updated 2017-11-21 22:51

Top of page Top of page


This information is provided as a public service. Although we endeavor to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.

Road information by phone




Random Weather Facts

DEW POINT
Dew point is the temperature to which air must be cooled for saturation (100% relative humidity) to occur. The dew point is an important measurement used to predict the formation of dew, frost, and fog. If dew point and temperature are close together in the late afternoon when the air begins to turn colder, fog is likely during the night. Dew point is also a good indicator of the air's actual water vapor content, unlike relative humidity, which takes the air's temperature into account. High dew point indicates high vapor content; low dew point indicates low vapor content. In addition a high dew point indicates a better chance of rain and severe thunderstorms. You can even use dew point to predict the minimum overnight temperature. Provided no fronts or other weather pattern changes are expected overnight, the afternoon's dew point gives you an idea of what minimum temperature to expect overnight.